IOM – FLEXY II – 1007 – E
Page 18
When the f rame is correctly positioned, it is essential to secure the assembly with a disconnected stitched welded seam (20 to
30mm every 200mm
) along the outside or by using an alternativ e method
CURBING AND FLASHING
Outside of frame must be insulated with rigid type insulation;
We recommend a minimum of 20 mm thick insulation (2-f igure 7).
Check that the insulation is continuous, counter f lash and seal around the
frame
as shown in (1-f igure 7).
CAUTION: To be effective, the upstream must end below the drop edge (3 - figure
7).
Where pipes and electrical conduits extend through the roof, flashing must be
conf ormed to local codes of practice.
Bef ore installing the equipment, make sure that seals are not damaged and check that the unit is secured to the mounting
frame. Once in position, the bottom of the equipment must be horizontal.
The installer must comply with local authority standards and specifications.
RECOMMENDATIONS FOR DUCTS CONNECTIONS
Some rules must be complied with for the connections between ducts and unit done on site.
INSTALLATION ON A ROOFMOUNTING FRAME
Fig. 7
Summary of Contents for ROOFTOP FLEXY FXK 100
Page 2: ......
Page 11: ...IOM FLEXY II 1007 E Page 9 COMMENTS COMMISSIONING REPORT...
Page 41: ...IOM FLEXY II 1007 E Page 39 VENTILATION AIRFLOW BALANCING AT18 18S...
Page 42: ...IOM FLEXY II 1007 E Page 40 VENTILATION AIRFLOW BALANCING ADH355L...
Page 43: ...IOM FLEXY II 1007 E Page 41 VENTILATION AIRFLOW BALANCING ADH450L...
Page 44: ...IOM FLEXY II 1007 E Page 42 VENTILATION AIRFLOW BALANCING ADH500L...
Page 60: ...IOM FLEXY II 1007 E Page 58 60kW 120kW HEATING GAS BURNER...
Page 61: ...IOM FLEXY II 1007 E Page 59 180kW 240kW HEATING GAS BURNER...
Page 68: ...IOM FLEXY II 1007 E Page 66 60kW 120kW HEATING MODULATING GAS BURNER...
Page 69: ...IOM FLEXY II 1007 E Page 67 180kW 240kW HEATING MODULATING GAS BURNER...
Page 74: ...IOM FLEXY II 1007 E Page 72 CLIMATIC 50 CONTROLER ELECTRICAL DATA WIRING DIAGRAMS...
Page 75: ...IOM FLEXY II 1007 E Page 73 CLIMATIC 50 INPUT FCM FHM FGM FDM ELECTRICAL DATA WIRING DIAGRAMS...
Page 76: ...IOM FLEXY II 1007 E Page 74 CLIMATIC 50 OUTPUT FCM FHM FGM FDM ELECTRICAL DATA WIRING DIAGRAMS...
Page 77: ...IOM FLEXY II 1007 E Page 75 DAD SMOKE DETECTOR ELECTRICAL DATA WIRING DIAGRAMS...
Page 78: ...IOM FLEXY II 1007 E Page 76 GENERAL CUSTOMER CONNECTION TCB ELECTRICAL DATA WIRING DIAGRAMS...
Page 81: ...IOM FLEXY II 1007 E Page 79 WIRING DIAGRAM GAS BURNER 120kW ELECTRICAL DATA WIRING DIAGRAMS...
Page 83: ...IOM FLEXY II 1007 E Page 81 WIRING DIAGRAM ELECTRIC HEATER ELECTRICAL DATA WIRING DIAGRAMS...
Page 89: ...IOM FLEXY II 1007 E Page 87 FCM 150 FHM 150 PRINCIPLE SKETCHES...
Page 90: ...IOM FLEXY II 1007 E Page 88 FCM 170 FHM 170 PRINCIPLE SKETCHES...
Page 91: ...IOM FLEXY II 1007 E Page 89 FCM 200 230 FHM 200 230 PRINCIPLE SKETCHES...
Page 100: ...IOM FLEXY II 1007 E Page 98 LONGVIC SITE ISO 9001 2000 CERTIFICATE...
Page 101: ...IOM FLEXY II 1007 E Page 99 EC CONFORMITY DECLARATION...
Page 102: ...IOM FLEXY II 1007 E Page 100 DAD LOTUS CERTIFICATE...
Page 103: ...IOM FLEXY II 1007 E Page 101 GLASS WOOL INSULATION CERTIFICATE...
Page 104: ...IOM FLEXY II 1007 E Page 102 GLASS WOOL INSULATION CERTIFICATE...
Page 105: ...IOM FLEXY II 1007 E Page 103 F7 FILTER INSULATION CERTIFICATE...
Page 106: ...IOM FLEXY II 1007 E Page 104 G4 FILTER INSULATION CERTIFICATE...
Page 107: ...IOM FLEXY II 1007 E Page 105 FLEXY 60 120 180 240 KW GAS BURNER CERTIFICATE...
Page 108: ...IOM FLEXY II 1007 E Page 106 ROOFTOP PED CONFORMITY CERTIFICATE...
Page 109: ...IOM FLEXY II 1007 E Page 107 ROOFTOP PED CONFORMITY CERTIFICATE...