IOM – FLEXY II – 1007 – E
Page 17
CAUTION
:
-
An approach ramp must be installed if the unit’s installation requirements tell that it's
necessary to reach the main switch. This recommendation is valid for installations in
general and in particular for return and curbs. It’s also valid to reach other parts of
the unit: filters, refrigerant circuit, etc…
-
It’s advised to fix curbs and roofcurbs to the unit.
As lev els are adjustable, observe the following
recommendations when installing the equipment
Abov e all, ensure that all the adjustable returns are facing
outward (“1” f igure 4). They are usually turned inside-out
f or transport.
Place the roof mounting f rame on the trimmer beam by
f irst lining up the inlet and the outlet opening
.
(“2”- figure 5)
After lev elling the f rame, secure the adjustable returns on
the trimmer.
It is important to centre the unit on the roof frame
INSTALLATION ON A ROOFMOUNTING FRAME
Fig. 4
Fig. 5
Fig. 6
Summary of Contents for ROOFTOP FLEXY FXK 100
Page 2: ......
Page 11: ...IOM FLEXY II 1007 E Page 9 COMMENTS COMMISSIONING REPORT...
Page 41: ...IOM FLEXY II 1007 E Page 39 VENTILATION AIRFLOW BALANCING AT18 18S...
Page 42: ...IOM FLEXY II 1007 E Page 40 VENTILATION AIRFLOW BALANCING ADH355L...
Page 43: ...IOM FLEXY II 1007 E Page 41 VENTILATION AIRFLOW BALANCING ADH450L...
Page 44: ...IOM FLEXY II 1007 E Page 42 VENTILATION AIRFLOW BALANCING ADH500L...
Page 60: ...IOM FLEXY II 1007 E Page 58 60kW 120kW HEATING GAS BURNER...
Page 61: ...IOM FLEXY II 1007 E Page 59 180kW 240kW HEATING GAS BURNER...
Page 68: ...IOM FLEXY II 1007 E Page 66 60kW 120kW HEATING MODULATING GAS BURNER...
Page 69: ...IOM FLEXY II 1007 E Page 67 180kW 240kW HEATING MODULATING GAS BURNER...
Page 74: ...IOM FLEXY II 1007 E Page 72 CLIMATIC 50 CONTROLER ELECTRICAL DATA WIRING DIAGRAMS...
Page 75: ...IOM FLEXY II 1007 E Page 73 CLIMATIC 50 INPUT FCM FHM FGM FDM ELECTRICAL DATA WIRING DIAGRAMS...
Page 76: ...IOM FLEXY II 1007 E Page 74 CLIMATIC 50 OUTPUT FCM FHM FGM FDM ELECTRICAL DATA WIRING DIAGRAMS...
Page 77: ...IOM FLEXY II 1007 E Page 75 DAD SMOKE DETECTOR ELECTRICAL DATA WIRING DIAGRAMS...
Page 78: ...IOM FLEXY II 1007 E Page 76 GENERAL CUSTOMER CONNECTION TCB ELECTRICAL DATA WIRING DIAGRAMS...
Page 81: ...IOM FLEXY II 1007 E Page 79 WIRING DIAGRAM GAS BURNER 120kW ELECTRICAL DATA WIRING DIAGRAMS...
Page 83: ...IOM FLEXY II 1007 E Page 81 WIRING DIAGRAM ELECTRIC HEATER ELECTRICAL DATA WIRING DIAGRAMS...
Page 89: ...IOM FLEXY II 1007 E Page 87 FCM 150 FHM 150 PRINCIPLE SKETCHES...
Page 90: ...IOM FLEXY II 1007 E Page 88 FCM 170 FHM 170 PRINCIPLE SKETCHES...
Page 91: ...IOM FLEXY II 1007 E Page 89 FCM 200 230 FHM 200 230 PRINCIPLE SKETCHES...
Page 100: ...IOM FLEXY II 1007 E Page 98 LONGVIC SITE ISO 9001 2000 CERTIFICATE...
Page 101: ...IOM FLEXY II 1007 E Page 99 EC CONFORMITY DECLARATION...
Page 102: ...IOM FLEXY II 1007 E Page 100 DAD LOTUS CERTIFICATE...
Page 103: ...IOM FLEXY II 1007 E Page 101 GLASS WOOL INSULATION CERTIFICATE...
Page 104: ...IOM FLEXY II 1007 E Page 102 GLASS WOOL INSULATION CERTIFICATE...
Page 105: ...IOM FLEXY II 1007 E Page 103 F7 FILTER INSULATION CERTIFICATE...
Page 106: ...IOM FLEXY II 1007 E Page 104 G4 FILTER INSULATION CERTIFICATE...
Page 107: ...IOM FLEXY II 1007 E Page 105 FLEXY 60 120 180 240 KW GAS BURNER CERTIFICATE...
Page 108: ...IOM FLEXY II 1007 E Page 106 ROOFTOP PED CONFORMITY CERTIFICATE...
Page 109: ...IOM FLEXY II 1007 E Page 107 ROOFTOP PED CONFORMITY CERTIFICATE...