background image

Page 28

HP29 THREE-PHASE OPERATING SEQUENCE

a−HP29 Y", G", and J" Voltage Operation Sequence

This is the sequence of operation for HP29 Y" voltage.
HP29 G" and J" voltage units are similar, but have a few
additions. The G" voltage units have an outdoor fan relay,
while the  J" voltage units have the outdoor fan relay plus
an outdoor fan transformer. The Y" voltage unit sequence
is outlined by numbered steps which correspond to circled
numbers on the adjacent diagram.

NOTE− The thermostat used may be electromechanical
or electronic.

NOTE− Transformer in indoor unit supplies power (24
VAC) to the thermostat and outdoor unit controls.

COOLING:

1 − Internal thermostat wiring  energizes terminal O by

cooling mode selection, energizing the reversing valve
L1. Cooling demand initiates at Y1 in the thermostat.

2 − 24VAC energizes compressor contactor K1.

3 − K1-1  N.O.  closes  energizing  compressor  (B1)  and

outdoor fan motor (B4).

4 − Compressor  (B1)  and  outdoor  fan  motor  (B4)

begin immediate operation.

END OF COOLING DEMAND:

− 

Cooling demand is satisfied. Terminal Y1 is

de-energized.

6 − Compressor contactor K1 is de-energized.

7 − K1-1 opens and compressor (B1) and outdoor fan

motor (B4) are de-energized and stop
immediately.

− 

Terminal O is de−energized when internal
thermostat wiring is out of cooling mode,
de−energizing reversing valve L1.

FIRST STAGE HEAT:

9 − Heating demand initiates at Y1.

10 − 24VAC energizes compressor contactor K1.

11 − K1-1  N.O.  closes  energizing  compressor  and

outdoor fan motor.

12 − See step 4.

END OF FIRST STAGE HEAT:

13 − Heating  demand  is  satisfied.  Terminal  Y1  is

de-energized.

14 − Compressor contactor K1 is de-energized.
15 − K1-1 opens and compressor (B1) and outdoor

fan motor (B4) are de-energized and stop
immediately.

DEFROST MODE:

16 − During  heating  operation  when 

outdoor  coil

temperature drops below 35

_

F (2

_

C) or   42

_

(5.5

_

C)

(see defrost system description for specific  unit dash
number) 

unit defrost switch (thermostat) S6 closes.

17 − Defrost  control  CMC1  begins  timing.  If  defrost

thermostat (S6) remains closed at the end of the
30,60 or 90 minute period, defrost relay energizes
and defrost begins.

18 − During  defrost  CMC1  energizes  the  reversing  valve

and W1 on the terminal strip (operating indoor unit on
the first stage heat mode), while de-energizing outdoor
fan motor B4.

19 − Defrost  continues  14  + 1 minutes or until thermostat

switch (S6) opens. When defrost thermostat opens,
defrost control timer loses power and resets.

20 − When CMC1 resets, the reversing valve and W1 on the

terminal strip are de-energized, while the  outdoor fan
motor B4 is energized.

Summary of Contents for HP29 Series

Page 1: ...blades 18 457 3 18 457 3 18 457 4 Outdoor Motor hp W 1 6 124 1 6 124 1 6 124 Outdoor Coil F Cfm L s 2400 1135 2400 1135 2500 1180 Coil Fan Rpm 1105 1105 1100 Watts 180 180 200 Refrigerant charge furni...

Page 2: ...oz 5 34kg Liquid line in mm o d connection sweat 3 8 9 5 3 8 9 5 3 8 9 5 3 8 9 5 Vapor line in mm o d connection sweat 7 8 22 2 7 8 22 2 7 8 22 2 1 1 8 28 6 Shipping weight lbs kg 1 package 182 83 19...

Page 3: ...1 9 1 0 4 1 4 1 2 1 2 1 4 1 4 1 2 1 2 1 Rec maximum fuse or circuit breaker size amps 40 25 15 50 30 15 10 60 40 20 15 Minimum circuit ampacity 27 3 17 1 8 6 31 5 18 8 10 2 8 2 37 4 23 5 12 2 9 8 Refe...

Page 4: ...l or reciprocating and fan in single phase units use permanent split capacitor motors The capacitor is located inside the unit control box see figure 4 and 5 A single dual capacitor C12 is used for bo...

Page 5: ...t terminal Y1 24V Single phase HP29 units are not equipped with a 24V transformer All 24 VAC controls are powered by the indoor unit Refer to unit wiring diagram J voltage units only are equipped with...

Page 6: ...ced to 6 5 seconds The TEST mode may be started at any time If the jumper is in the TEST position at power up or for longer than five minutes the control will ignore the TEST selection and will defaul...

Page 7: ...90 T3 minutes See figure 7 The defrost timing jumper is factory installed to provide a 60 minute defrost interval If the timing selector jumper is not in place the control defaults to a 90 minute defr...

Page 8: ...the unit The time delay may be bypassed by placing the temperature select jumper across the TEST pins for 0 5 seconds Pressure Switch Circuit The defrost control board used in optional units includes...

Page 9: ...nd its inherent properties Two identical scrolls are mated together forming concentric spiral shapes One scroll remains stationary while the other is allowed to orbit The orbiting scroll does not rota...

Page 10: ...N MOTOR AND COMPRESSOR ACCESS Remove 7 screws REMOVE 7 SCREWS SECURING FAN GUARD REMOVE FAN GUARD FAN ASSEMBLY FAN GUARD WIRING DRIP LOOP Remove 4 nuts ALIGN FAN HUB FLUSH WITH MOTOR SHAFT D Reversing...

Page 11: ...Tighten finger tight then tighten an additional 1 6 turn FIGURE 12 LIQUID LINE SERVICE VALVE VALVE OPEN SCHRADER VALVE SERVICE PORT SERVICE PORT CAP INSERT HEX WRENCH HERE INLET TO INDOOR COIL OUTLET...

Page 12: ...is used on HP29 5 ton units These vapor line service valves function the same way differences are in construction Valves are not rebuildable If a valve has failed it must be replaced A ball valve is...

Page 13: ...16 7 9 5 8 15 9 HP29 024 L10 15 21 50 50 15 L15 31 20 20 6 HP29 311 L15 31 30 30 9 5 16 7 9 3 4 19 HP29 311 HP29 030 L15 31 40 40 12 5 16 7 9 3 4 19 L15 31 50 50 15 L10 15 41 20 20 6 HP29 410 L10 15...

Page 14: ...th vacuum gauge to center port of gauge manifold With both manifold service valves open start pump and evacuate indoor coil and refrigerant lines IMPORTANT A temperature vacuum gauge mercury vacuum U...

Page 15: ...Ambient Temperature HP29 261 HP29 311 HP29 461 APPROACH METHOD AMBIENT TEMPERATURE OF 60 _F 16 _C OR ABOVE 13 F 7 2 C 16 F 8 9 C 13 F 7 2 C HP29 211 10 F 5 6 C HP29 511 16 F 8 9 C HP29 651 18 F 10 C 1...

Page 16: ...183 72 Cooling TXV 85 29 200 76 210 74 214 72 215 75 205 74 210 70 214 73 g TXV Only 95 35 230 78 241 75 246 74 249 76 245 75 240 71 248 75 Only 105 41 263 81 275 78 282 45 285 76 280 76 280 72 285 7...

Page 17: ...uns Figure 19 shows how to make a transition from horizontal to vertical Finally figure 20 shows how to place the outdoor unit and line set REFRIGERANT LINE SETS HOW TO INSTALL VERTICAL RUNS new const...

Page 18: ...hang line set from joist or rafter use either metal strapping material or anchored heavy nylon wire ties Floor Joist or Roof Rafter Wall Stud Liquid Line Vapor Line Wrapped in Armaflex Strap Liquid L...

Page 19: ...Page 19 VII WIRING DIAGRAMS AND SEQUENCE OF OPERATION HP29 SINGLE PHASE WITH RECIPROCATING COMPRESSOR HP29 1 2 UNITS 1 2 3 5 6 4 7 8 9 10 11 12 15 14 16 17 18 19 20 1 19 19...

Page 20: ...Page 20 HP29 SINGLE PHASE WITH RECIPROCATING COMPRESSOR 1 2 3 5 6 4 7 8 9 10 11 12 15 14 16 17 18 19 20 1 19 19...

Page 21: ...Page 21 HP29 SINGLE PHASE WITH RECIPROCATING COMPRESSOR 1 2 3 5 6 4 7 8 9 10 11 12 15 14 16 17 18 20 1 19 19...

Page 22: ...Page 22 HP29 SINGLE PHASE WITH SCROLL COMPRESSOR HP29 1 2 UNITS 1 2 3 6 4 7 8 9 10 11 12 15 14 16 17 18 19 20 1 19 19 4...

Page 23: ...Page 23 HP29 SINGLE PHASE WITH SCROLL COMPRESSOR 1 2 3 6 4 7 8 9 10 11 12 15 14 16 17 18 19 20 1 19 19 4...

Page 24: ...Page 24 HP29 SINGLE PHASE WITH SCROLL COMPRESSOR 1 2 3 6 4 7 8 9 10 11 12 15 14 16 17 18 20 1 19 19 4...

Page 25: ...mpressor contactor K1 is de energized 8 K1 1 opens and compressor B1 and outdoor fan motor B4 are de energized and stop immediately 9 Terminal O is de energized when internal thermostat is out of cool...

Page 26: ...14 16 17 18 19 1 4 18 18 18 NOTE Scroll three phase compressors must be phased correctly Compressor noise may be significantly higher indicating phasing is incorrect Compressor operating backwards wil...

Page 27: ...Page 27 HP29 THREE PHASE WITH RECIPROCATING OR SCROLL COMPRESSOR 1 2 3 5 6 7 8 9 10 11 13 15 14 16 17 18 19 1 18...

Page 28: ...ed and stop immediately 8 Terminal O is de energized when internal thermostat wiring is out of cooling mode de energizing reversing valve L1 FIRST STAGE HEAT 9 Heating demand initiates at Y1 10 24VAC...

Reviews: