eNeRGy-IOM-2020.12-EN
•
26
•
Positioning the rooftop on roofcurb
IMPORTANT note: Prior to put the machine, make sure to put a polyethylene gasket on the
roofcurb upper flange side (must be delivered in the roofcurb package).
This gasket must be put only on the external perimeter of the roofcurb and around the supply and return
section
During the installation of the unit on the roofcurb, it’s important to keep the unit in horizontal position or with the treatment box
slightly downwards. It will make the positioning of the return and the supply easier.
INSTALLATION ON A ROOFCURB
Summary of Contents for E014AH055FM2M
Page 2: ......
Page 5: ...eNeRGy IOM 2020 11 EN 5...