Annex 2: Commissioning instructions
You have purchased a condensing unit with two compressors. The instructions below will guide you to its commissioning.
Equipment needed:
A spirit level
A multimeter ammeter / voltmeter
A phase controller
A set of PPE (latex gloves / leather gloves / protective mask / cotton workwear / safety shoes)
Multi-fluid electronic manifold (example: TESTO 550) with hoses equipped with service valves (4 minimum)
A
vacuum meter
A vacuum pump
A scale
Valve ratchet wrench
Philips screwdriver and flat
Monkey wrench
A nitrogen cylinder
Nitrogen gas expander pressure gauge
Consumable needed
A bottle of refrigerant in the sufficient quantity
A small oil can EAL 22CC or equivalent with approval of COPELAND EMERSON
Preamble to commissioning
Please check the following:
1.
That the equipment is set up level both in its longitudinal part and its depth (control it with a spirit level),
2.
That the supply voltage between phase and between each phase and the neutral (400V between phase and 230V
between phase and neutral, maximum tol/- 5%),
3.
That equipotential bounding to the ground according to the neutral regime,
4.
That all the electrical connections of the electrical box and in particular on the terminal blocks are tight,
5.
That the substation servocontrols are well wired (when the KAAS10 relay is stopped all the solenoid valves of the cold
stations must be closed),
6.
That the general switch disconnector is open.
Summary of Contents for FRIGA-BOHN DUO CU 114
Page 2: ...441 DUO CU 2 72 FR Caract ristiques dimensionnelles DUO CU A DUO CU C...
Page 24: ...441 24 72 DUO CU GB Dimensional characteristics DUO CU A DUO CU C...
Page 38: ...441 38 72 DUO CU GB Annex 3 Instructions of the oil level regulator TraxOil OM3 230V...
Page 46: ...441 46 72 DUO CU SP Caracter sticas dimensionales DUO CU A DUO CU C...
Page 56: ...441 56 72 DUO CU SP...
Page 69: ...DUO CU 69 72 Sch ma frigorifique refrigeration diagram diagrama de refrigeraci n...
Page 70: ...441 70 72 DUO CU...