
50
WIRING
■
Control:
The pulse operated latching relay or the
contactors are controlled via the CX³ EMS
bus; simply connect the phase to the
terminal as shown below.
Phase
connection
terminal
You will find possible wiring
examples on the module
technical data sheet 4 149 31,
available online.
■
CX³ EMS bus:
There are 2 possible solutions for connection to the bus:
At the back of the
modules via
communication rail
Cat. Nos 4 149 01/02/03
The CX³ EMS bus connection specifications are common to all EMS CX³
products and are detailed in the product data sheets.
At the bottom of
the modules via
communication cable
Cat. No 4 149 07/08/09
RAIL CONNECTION
CABLE CONNECTION
Summary of Contents for EMS CX3
Page 6: ...4 CX3 EMS complete compact and multifunctional MEASUREMENT SIGNALLING...
Page 33: ...31 TECHNICAL GUIDE CX EMS Energy Management System WWW LEGRAND COM...
Page 39: ...37 TECHNICAL GUIDE CX EMS Energy Management System WWW LEGRAND COM...
Page 47: ...45 TECHNICAL GUIDE CX EMS Energy Management System WWW LEGRAND COM...
Page 65: ...63 TECHNICAL GUIDE CX EMS Energy Management System WWW LEGRAND COM...
Page 69: ...67 TECHNICAL GUIDE CX EMS Energy Management System WWW LEGRAND COM...
Page 75: ...73 TECHNICAL GUIDE CX EMS Energy Management System WWW LEGRAND COM...
Page 95: ...93 TECHNICAL GUIDE CX EMS Energy Management System WWW LEGRAND COM Notes...
Page 96: ...94 Notes...
Page 97: ...95 TECHNICAL GUIDE CX EMS Energy Management System WWW LEGRAND COM Notes...