Product Overview and Setup 

NOTE

:

 

Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. Please keep 

the original package in a safe place for future use. 

 

2-1 Rear Panel View 

 

 
1.

 

DC connector : connects to either UPS or 2

nd

 battery box 

2.

 

DC breaker: Battery over-current protection breaker 
 

2-2 Installation and Setup with UPS 

 

Unpacking & Inspection 

1.

 

Remove the battery box from the packing.   

NOTE

:

 

The battery box is very heavy, be cautious when unpacking and lifting the unit to avoid injury. 

 

2.

 

Check the inside package 

 

Battery box unit 

 

Quick guide 

 

Battery connection cable x 1 

 

Ear x 2 

 

Screw x 8 

 

Extended stand x 4 

 
 

 
 

 
 
 

Selecting Installation Position 

It is necessary to select a proper environment to install the unit, in order to minimize the possibility of damage to the 

battery box and extend the life of the batteries. Please follow the instructions below: 

1.

 

Keep at least 20cm (8 inches) clearance from the rear panel of the unit from the wall or other obstructions. 

2.

 

Do not block the air-flow to the ventilation openings of the unit. 

3.

 

Please ensure the installation site environmental conditions are in accordance with the unit’s working specifications 
to avoid overheat and excessive moisture. 

4.

 

Do not place the unit in a dusty or corrosive environment or near any flammable objects. 

5.

 

This unit is not designed for outdoor use. 

 

This unit can either be rack mounted or placed vertically on a desk.   

Rack Installation 

     

   

 

 

 

 

 

 

 

Battery connection cable 
 

    Ears   

Screws 

 

Extended stand 

Summary of Contents for Battery Box 24V

Page 1: ...Expandable Battery Box User Manual I 00890 Rev A...

Page 2: ...easily accessible and close to the system Temperature Rating Units are considered acceptable for use in a maximum ambient environment of 104 F 40 C The unit is heavy Lifting the unit requires a minim...

Page 3: ...l torque shall be provided Do not attempt to dispose of batteries by burning them This could cause an explosion Do not open or destroy batteries Escaping electrolyte can cause injury to the skin and e...

Page 4: ...u condensateur haute capacit telles que les condensateurs BUS Seules des personnes connaissent bien les batteries et avec les mesures de pr caution requises peuvent les remplacer et superviser les op...

Page 5: ...installation d entretien Si des batteries doivent tre install es par le personnel de service des instructions pour les interconnexions y compris le couple aux bornes doivent tre fournies N essayez pa...

Page 6: ...electing Installation Position It is necessary to select a proper environment to install the unit in order to minimize the possibility of damage to the battery box and extend the life of the batteries...

Page 7: ...sion 8 pieces of 12V 9Ah 4 4 batteries 72V 18Ah Version 12 pieces of 12V 9Ah 6 6 batteries 3 Battery Installation If your battery box is not installed with batteries please follow the proper correspon...

Page 8: ...y box Step 5 Now it is possible to put all batteries in battery box following the picture below in the following drawing is indicated the fasten positions for the correct batteries placing NOTE To ins...

Page 9: ...on the top and 4 screws on the back side Step 4 Once battery box is opened remove the battery fixing plate present on the left side by unscrewing 2 screws present Pull up first and then push the batt...

Page 10: ...rews Step 9 Then connect the battery box to the UPS Battery Box 48V Step 1 Open the package and place the battery box on a horizontal plane Step 2 Remove the removable front panel part by pulling it f...

Page 11: ...o install the second branch of batteries repeat the same procedure on the right side of battery box Step 8 Put metal top cover back to the unit Close the frontal fixing plate and the two parts of the...

Page 12: ...e fasten positions for the correct batteries placing NOTE To install the second branch of batteries repeat the same procedure on the right side of battery box Step 6 Use the wiring diagram in the next...

Page 13: ...The cable connection from the external battery connector to the PCB is already present inside the battery box All the other cable connections should be made as shown on the wiring diagram Batt Link P...

Page 14: ...e connection from the external battery connector to the PCB is already present inside the battery box All the other cable connections should be made as shown on the wiring diagram Batt Link PCBA Batt...

Page 15: ...e connection from the external battery connector to the PCB is already present inside the battery box All the other cable connections should be made as shown on the wiring diagram Batt Link PCBA Batt...

Page 16: ...e connection from the external battery connector to the PCB is already present inside the battery box All the other cable connections should be made as shown on the wiring diagram Batt Link PCBA Batt...

Page 17: ...harge the unit for 4 hours Store the unit covered and upright in a cool dry location During storage recharge the battery in accordance with the following table Storage Temperature Recharge Frequency C...

Reviews: