39
DO NOT DIVE.
101
DO NOT DIVE.
15A GFCI
TEST
RESET
15
*SPA CONTROL SYSTEM
* Refer to wiring diagram inside spa control
system for proper power connection to terminals.
Only black hot (L1), white neutral (N) and
ground will be connected to the spa control
system terminals for this 120V configuration.
MAIN ELECTRICAL PANEL
(HOUSE)
DEDICATED 120V, 15A
WALL RECEPTACLE
CONFIGURATION 1
120V, 15A SERVICE
(DEDICATED)
WHT
BLK
GND
WHT
BLK
GND
Key
WHT - White Neutral
BLK - Black Hot, Line 1
RED - Red Hot, Line 2
GND - Ground
ELECTRICAL REQUIREMENTS
Configuration 1 - 120V, 15A Service
Summary of Contents for LW 524
Page 1: ...A H E R I T A G E O F Q U A L I T Y OWNER S MANUAL ...
Page 2: ......
Page 39: ...37 DO NOT DIVE SITE PREPARATION GENERAL GUIDELINES 102 DO NOT DIVE ...
Page 60: ...58 DO NOT DIVE Spa Controls Pump Diagrams LW 524 Pump 1 Air Control Pump 1 REV 012018 ...
Page 61: ...59 DO NOT DIVE Spa Controls Pump Diagrams LW 715 Pump 1 REV 012018 Pump 1 Air Control ...
Page 75: ......