Installation and Getting Started
2-2
D850R3
User’s Manual Switchos
•
If flammable or toxic solvents are to be used, a suitable ventilation system
should be provided.
•
The use of open flames in the laboratory should be prohibited.
•
Corrosive vapors or dust should not be present as these materials can
adversely affect the long-term performance of the system.
The Switchos Advanced Microcolumn Switching Unit requires approximately 190
mm (7.5”) of linear bench space. The lab bench should be capable of supporting
the entire system (for the LC Packings UltiMate, FAMOS and Switchos we
recommend that the lab bench be capable of supporting at least 100kg (225 lb.).
The power consumption of the Switchos is 100 VA (the power consumption of
the UltiMate Capillary HPLC System is 250 VA and of the FAMOS
Microautosampler is 250 VA).
DANGER
Danger: The Switchos Advanced Microcolumn Switching Unit must be connected
to a power source that is connected to a true ground. In addition, all other
components of the system (e.g. the HPLC pump, the detector) should be
connected to the same ground.
CAUTION
Caution: Do not install the Switchos Advanced Microcolumn Switching Unit in
areas subject to shock, dust, or in direct sunlight.
2.2
Unpacking
When the Switchos Advanced Microcolumn Switching Unit is received, carefully
unpack the unit and verify receipt of all components according to the packing list
(some components include sub-packing lists). It is recommended that all packing
materials be saved in the event that it is necessary to return any item to the
factory.
CAUTION
Note: When lifting the instrument from the shipping container, make sure that
the unit is kept upright. Lift the unit by placing your hands under the instrument.
If there is external damage to the shipping box, the damage should be reported
to the shipping agent and LC Packings upon receipt of the goods. If internal
damage is observed or if any items are missing, this should be reported to the
shipping agent and to LC Packings as soon as it is observed.
CAUTION
Note: If there is any apparent damage to the instrument, the user should
investigate the nature of the damage before plugging the unit into the mains to
ensure that powering up of the instrument will not create a hazardous condition
or damage internal components. If the damage appears significant, call
LC Packings or its local representative before connecting the unit to the mains.
Summary of Contents for SWITCHOS II
Page 6: ...Table of Contents iv D850R3 User s Manual Switchos II This page intentionally left blank...
Page 14: ...CE Declaration xii D850R3 User s Manual Switchos II This page intentionally left blank...
Page 22: ...Introduction 1 8 D850R3 User s Manual Switchos II This page intentionally left blank...
Page 80: ...The Switching Valves A 4 D850R3 User s Manual Switchos II This page intentionally left blank...
Page 82: ...Network Identification B 2 D850R3 User s Manual Switchos II This page intentionally left blank...