5
2. Installation
Warning: To ensure safety, please pay attention to cut off the AC breaker before installation.
The battery breaker also need to be cut off, if its a long backup time model.
Caution:
1. Installation and wiring must be performed by professional personnel in accordance with
local regulations.
2. The UPS needs to connect to the ground.
2.1 Unpacking inspection
Inspect the appearance of the UPS to see if there is any damage during transportation. Do not
turn on the unit and notify the carrier and dealer immediately if there is any damage or lacking
some parts.
Recycling: The packing boxes are recyclable, so please keep them well for using in the
future.
2.2 Wiring schedule
Attention: The diameter of the cable and the cross-sectional area of the three wires
depend on the real power of the UPS.
Model
AWG
Input
Output
Battery
Earth wire
6KS(L)
10 (6mm
²
)
10 (6mm
²
)
10 (6mm
²
)
10 (6mm
²
)
10KS(L)
8 (10mm
²
)
8 (10mm
²
)
8 (10mm
²
)
8 (10mm
²
)
2.3 UPS connection
Warning: The rated current for the switch of the AC power must be larger than the UPS
maximum input current. Otherwise the switch of the AC power will be burned and destroyed.
1. Please choose the wire according to the table
of wiring.
2. Remove the terminal cover on the back panel
of the UPS
①
.
3. Connect the input and output wires to the
corresponding input and output terminals.
4. Tie the wire tightly and pass through the holes
②
.
5. Tie the input, output and battery wire with the
wire, adjust the wire to the appropriate position
and fix the cable.
Summary of Contents for Dragon Power 2
Page 1: ...USER MANUAL ...