LAUNCH
440(440W) 455(455W) Installation Manual
7
≥
1 m
≥
1m
≥
4m
Fig.5
5.2.2 Base Plate layout
The bay layout is shown in Fig. 6.
l
With total width as the basis, draw two parallel lines (#1
and #2) on the concrete slab, with the error within
3mm.
l
Confirm the position of the power column near the
power source and mark the overall width and length so
that the position of 3 other columns can be confirmed.
l
Draw a diagonal line to show a triangle. The location
of the columns can be set with reference
.
Note:
l
All the dimensions are based on the external
border of the base plate.
l
Ensure the overall error is controlled within 6mm.
In this way, the difficulties in the final assembly, or
early wear or non-alignment of the lift can be
eliminated.
l
The marking and layout is very important. If it is
inaccurate, there will be problems during the final
assembly and operation.
www.diagtools.eu, Pernavas 43A, Riga, Latvia, LV-1009, +37129416069, [email protected]