LAUNCH
440(440W) 455(455W) Installation Manual
10
5.2.3 Runway and cross tube installation
l
Position left runway in bay with hydraulic
cylinder connection to front of bay. Cable and
sheaves are pre-assembled in runway. Runway
needs to be up off floor so cable ends, air and
hydraulic lines can be moved out for assembly.
Make sure cables are in proper sheave grooves.
l
Position front and rear cross tubes at respective
ends of runway (see Fig.7 and Fig.8). The
opening in the side of the tubes should be lined
up with the cable sheaves in the runway ends.
Feed cable ends through tube opening and do
not assemble the sheaves in the cross tube
ends at this time. Be sure cables are not
crossed inside tube.
l
With the openings in the cross tube side lined up
with the left runway ends, align the 2 holes in the
top of the front tube with holes in the runway end
plates and the holes in the front wheel stop. Bolt
runway to the cross tube. The right runway may
be located in 2 positions on tubes, allowing for 2
distances between runways to accommodate
different vehicles.
l
Bolt the right runway with cross tubes.
Oil Hose
Ca ble I I
Cabl e I
M10*2 5 Scr ew GB 5789- 86
Left Runw ay
Rig ht Ru nway
Cab le IV
Cab le II I
Fro nt Cro ss Tu be
Re ar Cr oss T ube
Fig.7
www.diagtools.eu, Pernavas 43A, Riga, Latvia, LV-1009, +37129416069, [email protected]