![Launch TLT440 Installation Manual Download Page 16](http://html1.mh-extra.com/html/launch/tlt440/tlt440_installation-manual_3879044016.webp)
LAUNCH
440(440W) 455(455W) Installation Manual
15
5.2.8 Air line connection
l
Locking latches require 100 psi. min to 120 psi. max
air pressure. A filter/regulator/lubricator must be
installed on air supply at lift. Failure to do so will void
the warranty.
l
Route the air lines based on Fig.15 and check for air
leaks by depressing air valve. Actuate air control valve
and check latch operation on all four corners. The
locking latches should pull in beyond cross tube ends
to clear the latch plate.
FRL Unit
Air Supply Hose
Air Control Valve
Bracket
FL Column
Plastic Tube
T Fitting FR Column
Air Connector
Front Cross Tube
Recoil Hose
T Fitting
Left Runway
Air Hose
Right Runway
RL Column
Air Connector
T Fitting
Rear Cross Tube
RR Column
To Rolling Jack Pump
Fig.15
www.diagtools.eu, Pernavas 43A, Riga, Latvia, LV-1009, +37129416069, [email protected]