Preparations
14
5 Preparations
5.1
Assembly and setting up
a) Immersion Thermostat
−
Hang the thermostat into the bath to be thermostated
(baths
➾
Section 10. Accessories)
☞
−
In baths made of plastic the heater should
not have contact to the sides of the bath!
−
Do not cover the ventilation opening at the
back of the unit.
Keep clear distance of at least 20 cm.
Adjustment of the pump chamber
−
The fixation of the temperature probe has
to be moved upwards approx. 15 mm.
−
Adjust the pump chamber.
−
Move the fixation of the temperature probe
downwards again (see ill. on the left)
−
For all LAUDA baths (plastic and deep-drawn baths),
please fix the adapter (standard accessory) on the
clamping bracket.
−
Turn the jet nozzle to face diagonally into the bath. The
outflow for the bath circulation can then be closed.
−
Turn the setting knob to the left (see. ill. 1.)
Adjustments of the pump outflows
ill 1
Setting knob turned anticlockwise
ill 2
Setting knob medium position
ill 3.
Setting knob turned clockwise
Summary of Contents for Ecoline E 200
Page 2: ......
Page 8: ...Brief operating instructions 2 ...
Page 53: ...Circuit diagram 14 04 99 YAEE0013 47 11 Circuit diagram ...