Chapter 2 - Pre-Installation
Series IV Concentrator U and I Guide
98-1031 Rev AA
11
Getting Organized
Concentrator Installation Tool List
•
Gas or hydraulic-powered drill, 3/4 inch augur bit
•
Two adjustable-end wrenches
•
Squeeze-on crimpers and crimps
•
Standard socket wrench set
•
Laptop computer with two serial ports
•
Concentrator and applicable install kit
•
Concentrator programming cable
•
Network Configuration Manager application
•
Concentrator power cable with standard 120VAC outlet
•
Survey sheet
•
Hyperterminal application
•
Personal Protection Equipment
•
Voltmeter
•
Cell phone or 2-way communication device
Additional Tools Required for Street Light or Traffic Signal Pole Installs
•
Steel banding tool
•
Tin snips
•
Hammer
Additional Tools Required for Building and Structure Installs
•
Steel banding tool
•
Hammer drill
•
Bits
Install Material
The installation process consists of using predetermined route information identifying concentrators
that need to be installed and methods for recording data to document the installation.
From the Cross-Dock, obtain concentrators and installation kits to install.