Assembly
Installation
15
4. On both sides: The M10x165 and M10x180 Hex Head Bolts used
to secure the Upright to the Frame are shipped in the Frame, held
in place during shipment with 16mm nuts. Remove the nuts and
allow the bolts to slide down and rest on the floor (Figure 2-12).
Figure 2-12. Bolt Shipping Position
5. Untie wire tie from the Upright. You will use this to pull the Upper
Harness through Upright Upper Access Hole later.
6. Align the pins on the bottom of the Upright Plate with the holes in
the Frame and lower the Upright fully onto the Frame (Figure 2-13).
M10x180 Hex Head Bolt
M16 Nut (4X)
M10x165 Hex Head Bolt
Summary of Contents for L10 90 Series
Page 1: ...Part Number 73208 L10 Treadmill 90 Series Installation Manual ...
Page 2: ......
Page 8: ...Contents 6 ...
Page 34: ...Installation Cover Installation 32 ...
Page 35: ......