![Land Pride RTR2570 Operator'S Manual Download Page 22](http://html1.mh-extra.com/html/land-pride/rtr2570/rtr2570_operators-manual_3711130022.webp)
Section 1: Assembly & Set-up
RTR2570 Rotary Tillers 311-251M
8/30/22
18
Top Drive Sprocket Assembly
Figure 1-11
Top Drive Sprocket Torquing
Refer to Figure 1-11:
Tighten nylock jam nut all the way down until sprocket is
bottomed out on bearing, refer to Figure 1-11. Back jam
nut out until you can install .015" feeler gauge between
sprocket and jam nut. Tighten jam nut up against feeler
gauge until snug. Pull feeler gauge out and tighten jam
nut 1/6 of a turn.
11929
NOTE:
The input shaft on gearbox should turn using
hand pressure.
Over-tightening the jam nut will cause
Down Pressure Kit
Figure 1-12
Down Pressure Kit
Refer to Figure 1-12:
Spring loaded rear deflector deflects flying debris and
levels the freshly tilled soil.
14706