Section 1: Assembly and Set-up
RGR12 & RGA12 Series Rotary Tillers 311-948M
1/7/19
15
Maximum Driveline Movement During Operation
Figure 1-9
Check Driveline Interference
WARNING
!
To avoid serious injury or death:
•
Do not raise center of lower 3-point hitch pins more than
24" above ground with power take-off engaged. Do not
engage power take-off if hitch pins are more than 24" above
ground. If 3-point hitch pins are raised above 24" with
power take-off engaged, the driveline can break and send
projectiles.
•
A rotating driveline must not exceed an angle of 25 degrees
1.
Start tractor, raise implement fully up, and back
implement over the support blocks used to
2. Without changing 3-point lift height, shut tractor
down before dismounting. Refer to
3. Check to make sure driveline does not exceed any of
the limits listed below:
•
Driveline does not exceed maximum allowable
length recorded in step 7 under
•
Center of lower 3-point hitch pins do not exceed
24" above ground level.
•
Driveline angle does not exceed 25
o
above
horizontal or 25
o
below horizontal.
4. If any limit was exceeded, adjust tractor 3-point lift
limiter to the height that will keep the driveline within
the recommended limit listed above. If left lever does
not have a lift height limiter, make a mark with tape or
other means to indicate maximum 24" lift height.
5. If needed, repeat steps 1-4 until all limits mentioned
in step 3 are maintained.
6. Start tractor, raise implement slightly, and drive
forward enough to clear support blocks.
7.
Lower implement to ground and shut tractor down
before dismounting. Refer to
24872
Driveline Maximum Length
Figure 1-8
Check Driveline Maximum Length
Driveline maximum length must, when fully extended,
have 1/3 overlap of the profile tubes with both inner and
outer profile tubes being of equal length as shown in
Figure 1-8. Check driveline maximum allowable length as
follows:
1.
Make sure
“Check Driveline Collapsible Length”
on page 14 has been completed before continuing
with instructions below.
2. Unhook driveline profiles from the tractor and
implement.
3. If profiles are assembled together, pull outer and
inner drivelines profiles apart.
4. Measure and record “Free Length” of inner and outer
profiles as shown in Figure 1-8.
5. Lubricate driveline u-joints, bearings, and profiles.
Refer to
6. Assemble driveline halves together until profile tubes
have exactly 1/3 profile overlap as shown.
7.
Measure driveline “Maximum Allowable Length” and
record that length here ______.
8. Start tractor, raise implement slightly, and drive
forward enough to clear support blocks.
9. Lower implement to ground and shut tractor down
before dismounting. Refer to
10. Continue with
24513
Outer Shielding has been removed for clarity.
IMPORTANT:
The driveline must be lubricated
before putting it into service.