10
Scheduled Maintenance/Cleaning
As Needed
•
Keep exterior surfaces of unit clean using a clean, damp cloth.
Daily
•
Using the cleaning solution, clean top cover and all exterior stainless steel surfaces.
•
Clean exterior of dispensing valves and ice chute.
•
Remove cup rest then clean the drip tray and cup rest. Replace cup rest and drip tray when
finished.
•
Wipe clean all splash areas using a damp cloth soaked in cleaning solution.
•
Clean beverage nozzles as specified by their corresponding cleaning and sanitizing sections
found on the next page of this manual.
Monthly
•
Clean the ice bin, auger, and ice chute assembly as specified by the section “Cleaning and
Sanitizing Ice Bin, Auger, and Ice Chute” on page XX.
Every Six Months
•
Clean the syrup lines as specified by the section “Cleaning and Sanitizing Syrup Lines - Bag in
Box” on page 10.
•
Pull out unit (if applicable) and clean behind and underneath. Check for any loose components
or noises.
Cleaning and Sanitizing Ice Bin, Auger, and Ice Chute
1. Disconnect power to the dispenser
2. Remove the Merchandiser and Top Cover.
3. Remove Ice Chute Lever, then remove Splash Plate
Assembly by lifting it up and out from the dispenser face.
Refer to the Automatic Agitation Warning on the first
page of this manual.
NOTE
It is recommended to perform this procedure monthly,
or more often if desired. Use the cleaning solution
described on page 7. An alternate solution of one part
water to one part vinegar may be used to remove
water spots and calcium deposits.
NOTE
Always remove the ice chute lever before removing the
splash plate.
NOTE
4. Remove or melt out any remaining ice from the ice bin.
5. Use a screwdriver to remove the Auger Motor shaft cover.
6. Remove the “C” clip from the Auger Motor Shaft.
7. Disconnect the Augor Motor wire harness from junction box.
8. Remove the four (4) screws from the bracket holding the
Auger Motor, flavor injector bracket, and LED light bracket.
9. Slide the Motor and Mounting Plate Assembly off of the
Auger Shaft.
C
A
B
A. Auger Motor
B. Auger Shaft
C. Solenoid
C
A
B
A. Solenoid
B. Solenoid Pin
C. Ice Chute Link
A
B
C
A. Auger Motor Shaft
B. “C” Clip
C. Ice Chute
10. Remove the Auger Motor Shaft Key and set aside.
11. Remove the second clip from the Auger Shaft.
12. Disconnect the Ice Chute wire harness from the junction box.
13. Disconnect the solenoid from Ice Chute link by pushing pin
through shaft until link is free. (Pin shown in out position)