background image

4

3

4

Preparation of Mounting Parts

Installing Pocket Trigger

5

Verification Before Installing Soft Closer

Pocket trigger

Insert this end with 
the pin.

Pay attention to the direction.

Correct set position

Trigger catcher

Correct set position

If the trigger

 

position is wrong, pull back the trigger catcher 

to the correct position using a 6

 

mm diameter hard bar.

Improper set position

6

Inserting Parts into Open Area Track

Insert the parts in order from  

  

  to 

    

.

You can insert the parts smoothly from the connecting end which has no burrs.

1

3

Front trigger

Upper roller

Soft closer

Pay attention to the direction.

1

2

3

Open area track

The edge which has three countersunk 
holes is the end to be connected.

Leading edge

Connecting side

OK

Door pocket track

Without verification the self closing feature may fail.

Trigger catcher

(Red colored part)

I

6

Countersunk head 

tapping screw 4 × 20

(not provided)

Casing

Main unit

Lever

Casing

1

2

Remove any dirt or aluminum chips from 
the track.
Tape around rollers and upper track to 
prevent inserted parts from falling.

 

Caution

Slot for trigger

Slot for soft closer / roller

 

Caution

When cutting, reinforce 
the track to prevent 
deformation at the 
cut section.

 

Caution

(Red colored Part)

Insert the pocket trigger 
until it reaches the end 
of the track.

Summary of Contents for FD50-H

Page 1: ...rious injury may result Do not use this product for any other purpose or with doors that are outside the specifications of this manual Do not disassemble or modify any parts other than those described...

Page 2: ...The example shows the sliding door when the leading edge at the fully opened position is aligned with the connecting position of the upper tracks To shift the connecting position towards the trailing...

Page 3: ...m 3960 mm When using 1260 mm track I5 2 I9 6 CSK Process holes for track mounting I5 2 I9 6 CSK Process holes for track mounting No use No use No use I5 2 I9 6 CSK Process holes for track mounting 1 C...

Page 4: ...Front trigger Upper roller Soft closer Pay attention to the direction 1 2 3 Open area track The edge which has three countersunk holes is the end to be connected Leading edge Connecting side OK Door p...

Page 5: ...area track Deviation of the joint position makes insertion of the trigger difficult The edge which has three countersunk holes is the end to be connected When sliding the pocket trigger use a screwdr...

Page 6: ...uide Support 10mm To be removed after hanging Verify that the main unit is not dislocated from the casing for either of the door ends Front face of door pocket Trailing edge at closed position 30 10 4...

Page 7: ...t the floor guide forwards or backwards Tighten all 4 screws after the adjustment Adjustment range 4 mm The adjustment of the door should be done with the jump prevention nut loosened Do not turn the...

Page 8: ...is removed if the pocket trigger has not been moved into the pocket track Hold the open area track when removing the last screw 1 2 3 Appendix 1 1 How to remove door Put a support of 10mm thickness u...

Page 9: ...area track The pocket trigger mark from the factory Pocket trigger 30 Margin DN Door width Width of door pocket Track length door pocket Opening width Track length opened area Margin DN 30 2 I5 additi...

Page 10: ...oor The door doesn t close softly Check if trigger is installed QVWDOO WULJJHU WR VSHFL HG SRVLWLRQ Check if door is closed by excessive force Do not close door by excessive force as it may damage the...

Reviews: