- 56 -
OPERATION AND MAINTENANCE
If problems occur during ignition or operation, the boiler will “LOCKOUT”, as signalled by the red light on the burner and the
red indicator on the control panel. After a “LOCKOUT”, wait around 30 seconds before restoring the ignition conditions. To
restore the ignition conditions, press the burner “button/light” and wait for the flame to ignite. If this operation fails, it can be
repeated a maximum 2-3 times, then check:
- The information provided in the burner instruction booklet.
- The chapter on “CHECKING THE OPERATION OF THE BOILER”.
- The electrical connections described on the diagram supplied with the control panel.
When the boiler has started, check that it stops and starts again:
- Adjust the setting of the boiler thermostat.
- Move the main switch on the control panel.
- Set the room thermostat, the timer or the temperature controller.
- Check that the pumps are not blocked and rotate in the correct direction.
- Check the total shutdown of the boiler using the main system switch.
If all the conditions are correct, restart the appliance, check the combustion (flue gas analysis), the fuel rate and the tightness
of the gaskets on the door and the smokebox.
CHECKING THE OPERATION OF THE BURNER
- Refer to the burner instruction manual.
- Follow all the local legislation in force on burner maintenance.
Summary of Contents for MEGA 1060
Page 2: ......
Page 13: ...13 ITALIANO INSTALLAZIONE COLLEGAMENTO PANNELLO ELETTRICO MEGA 92 300 MEGA 350 1060...
Page 30: ......
Page 41: ...41 ENGLISH INSTALLATION ELECTRICAL PANEL CONNECTION MEGA 92 300 MEGA 350 1060...
Page 58: ......
Page 69: ...69 INSTALLATION FRAN AIS RACCORDEMENT PANNEAU ELECTRIQUE MEGA 92 300 MEGA 350 1060...
Page 86: ......
Page 97: ...97 INSTALACI N ESPA OL CONEXI N PANEL EL CTRICO MEGA 92 300 MEGA 350 1060...
Page 114: ......
Page 115: ......