- 40 -
GENERAL
CONTROL PANEL
The instrument panel supplied, made from plastic with index of protection IP40, holds the control and safety instruments.
The boiler must be connected to 230V - 50Hz single-phase + earth mains power, in compliance with the following requirements.
- The system must be compliant with the SAFETY STANDARDS IN FORCE.
- Use of a two-pole mains disconnect switch, compliant with the IEC-EN standards (minimum contact opening 3 mm).
- Observe the polarity L (Phase) - N (Neutral).
- Use cables with a minimum cross-section of 1.5 mm
2
.
- Refer to the wiring diagrams in this booklet for any operations on the electrical system.
- Connect the appliance to an effective earth system.
- A connection point is provided on the front head for earthing the boiler body.
1 2-stage
thermostat, 1
st
-2
nd
flame
2 Thermometer
3
Main power indicator light
4
System pump switch
5
Burner switch
6 Hour
counter
7
Burner lockout indicator light
8
Safety thermostat reset button
9
Space for temperature controller
1
2
3
4
5
6
7
8
9
Summary of Contents for MEGA 1060
Page 2: ......
Page 13: ...13 ITALIANO INSTALLAZIONE COLLEGAMENTO PANNELLO ELETTRICO MEGA 92 300 MEGA 350 1060...
Page 30: ......
Page 41: ...41 ENGLISH INSTALLATION ELECTRICAL PANEL CONNECTION MEGA 92 300 MEGA 350 1060...
Page 58: ......
Page 69: ...69 INSTALLATION FRAN AIS RACCORDEMENT PANNEAU ELECTRIQUE MEGA 92 300 MEGA 350 1060...
Page 86: ......
Page 97: ...97 INSTALACI N ESPA OL CONEXI N PANEL EL CTRICO MEGA 92 300 MEGA 350 1060...
Page 114: ......
Page 115: ......