- 50 -
INSTALLATION
ASSEMBLING THE BURNER
The assembly of the burner to the door of the boiler must
ensure perfect tightness to the products of combustion. Once
having installed the burner on the boiler, the space between
the burner draught tube and the refractory material on the
door must be filled with the layer of ceramic fibre (A) supplied.
This prevents the door from overheating and consequently
from being irreversibly deformed. The fuel connections to the
burner must be located so as to allow the complete opening
of the boiler door with the burner installed.
ASSEMBLING THE BURNER
MEGA
Lmin
Lmax
S
(mm)
(mm)
(mm)
92 - 152
230
300
172
190 - 350 - 399
250
320
192
469 - 600
290
360
218
720 - 1060
320
390
239
1250 - 1480
320
390
248
1890
340
410
262
2360
340
470
262
3000 - 3600
350
480
272
CONNECTING THE FLAME
INSPECTION WINDOW
The flame inspection window features a pressure fitting (1) to be
connected via a silicone hose or copper pipe to the outlet on the
burner (2). This operation allows the air blown by the fan to cool
the glass and prevent it from turning black. Failure to connect
the hose or pipe to the window may cause the glass to break.
Summary of Contents for MEGA 1060
Page 2: ......
Page 13: ...13 ITALIANO INSTALLAZIONE COLLEGAMENTO PANNELLO ELETTRICO MEGA 92 300 MEGA 350 1060...
Page 30: ......
Page 41: ...41 ENGLISH INSTALLATION ELECTRICAL PANEL CONNECTION MEGA 92 300 MEGA 350 1060...
Page 58: ......
Page 69: ...69 INSTALLATION FRAN AIS RACCORDEMENT PANNEAU ELECTRIQUE MEGA 92 300 MEGA 350 1060...
Page 86: ......
Page 97: ...97 INSTALACI N ESPA OL CONEXI N PANEL EL CTRICO MEGA 92 300 MEGA 350 1060...
Page 114: ......
Page 115: ......