background image

Dake Corporation 

1809 Industrial Park Dr. 

Grand Haven, MI 49417 

www.dakecorp.com

 

 

974315 

  4 

REV112019 

 

 

RETURN & REFUND POLICY 

Thank you for purchasing from Dake! If you are not entirely satisfied with your purchase, we are 

here to help. 

Returns 

All Dake manufactured / distributed machines, parts and couplings include a 30-day return 

option. These policies are valid from the date of final shipment to the end user. 

To be eligible for a return, the item must be unused and in the same condition as received. 

All requested warranty claims must be communicated to the distributor or representative 

responsible for the sale. Once communication has been initiated, Dake Customer Service must 

be contacted for approval:  

 

  

Phone: (800) 937-3253  

  

Email: [email protected] 

Once the return request has been approved by Customer Service, a representative will supply a 

Return Material Authorization (RMA) number. The returned item must have the provided RMA 

number clearly marked on the outside packaging. Any item received without an RMA number 

clearly visible on the packaging will not be processed.  

An RMA number can only be provided by the Dake Customer Service team and must be 

obtained prior to the return shipment. 

Refunds 

Once the item has been received and inspected for damages, a representative will notify the 

requestor referencing the provided RMA number. 

If the return is approved, a refund will be issued to the original method of payment, less a 20% 

restocking fee. The restocking fee may be waived if an order is placed at the time of return with 

like-value merchandise. 

Transportation costs are the responsibility of the end user and will not be credited upon return 

approval. 

Any item that is returned after the initial 30 days or has excessive/obvious use will not be 

considered for a full refund. 

 
 

 

 

Summary of Contents for DAKE SUPER CUT 315

Page 1: ...I 49417 Phone 800 937 3253 www dakecorp com DAKE MANUAL COLD SAW SUPER CUT 315 INSTRUCTIONAL MANUAL Read and understand all instructions and responsibilities before operating Failure to follow safety...

Page 2: ...G AND ANCHORING 8 ELECTRICAL CONNECTION 8 ASSEMBLING THE MACHINE 9 CHOOSING A BLADE 9 OPERATION 10 STARTING AND CUTTING 11 MAINTENANCE 12 ROUTINE MAINTENANCE 12 CHANGING THE BLADE 13 CUTTING ANGLE ADJ...

Page 3: ...o the repair work completed The standard limited warranty includes repair of the defective component part at no cost to the end user Warranty Process Subject to the conditions hereinafter set forth th...

Page 4: ...stallation or failure to operate or maintain the unit in accordance with the printed instructions provided c Defects or malfunctions resulting from abuse accident neglect or damage outside of prepaid...

Page 5: ...ved by Customer Service a representative will supply a Return Material Authorization RMA number The returned item must have the provided RMA number clearly marked on the outside packaging Any item rec...

Page 6: ...hase 3 Phase 1 Phase Weight 450 lbs Horsepower 1 6 2 35 HP Work Height 38 1 2 Speeds 3 Phase 22 44 RPM 1 Phase 44 RPM Height 59 Max blade diameter 12 1 2 Base 26 x 36 CUTTING CAPACITY 90 2 5 8 3 5 8 3...

Page 7: ...ety Warnings This machine is intended to be operated by one person This person should be conscious of the machine movement not only for themselves but also for persons on the immediate area of the mac...

Page 8: ...be stationary Always disconnect the machine from the power socket before changing the blade or carrying out any maintenance job even in the case of abnormal machine operation Do not operate this mach...

Page 9: ...fuses and earthing in the event of motor overload protection is provided by thermal probe In the event of incorrect operation or of dangerous conditions the machine may be stopped immediately by press...

Page 10: ...place Part 3 Attach and align the work support bracket on the left hand side of the saw base using the two bolts provided CHOOSING A BLADE The saw will come with a DAKE Saw Pitch Calculator to assist...

Page 11: ...the machine it is recommended to start using it in intervals of a half hour This operation should be repeated two or three times after this the machine may be used continuously Do not use cutting blad...

Page 12: ...ith vise lever 5 5 Grip the handle 6 of the head control arm and press the button checking that the blade is turning in the direction indicated if not invert the two phase leads and that sufficient co...

Page 13: ...s on the return spring WEEKLY MAINTENANCE Sharpen blade Clean blade housing Make sure the gearbox is full of oil Check power chord for any damage Clean shavings from lubricant tank Clean and grease th...

Page 14: ...eplace flange and screw the blade guard back in to place CUTTING ANGLE ADJUSTMENT Release the lever to rotate the cutting head and make sure that the desired cutting angle perfectly matches the refere...

Page 15: ...ll blade Speak with blade provider and sharpener Poor clamping pressure causing the part to move Check the material for tightness before cutting Check the condition of the jaw faces Insufficient coola...

Page 16: ...es on cutting surface Blade diameter incorrect and or too large Decrease blade diameter Poor clamping pressure causing the part to move Check the material for tightness before cutting Check the condit...

Page 17: ...ing and the outgoing voltages which should be 24 volts Auxiliary Relay Check voltages to relay terminals should be 24 volts If not check for loose wires if none relay should be replaced Motor will not...

Page 18: ...Dake Corporation 1809 Industrial Park Dr Grand Haven MI 49417 www dakecorp com 974315 17 REV112019 ELECTRICAL COMPONENTS Single Phase...

Page 19: ...Dake Corporation 1809 Industrial Park Dr Grand Haven MI 49417 www dakecorp com 974315 18 REV112019 Three Phase...

Page 20: ...n MI 49417 www dakecorp com 974315 19 REV112019 KEY 140 Auxiliary Relay 141 Remote control Switch 142 Fuse Carrier 143 Transformer 144 Socket Connector 145 Plug Connector 146 Speed Switch 147 Reset Bu...

Page 21: ...Dake Corporation 1809 Industrial Park Dr Grand Haven MI 49417 www dakecorp com 974315 20 REV112019 EXPLODED VIEW...

Page 22: ...0015 19 Vise Jaw Washer AFB8B037 20 Screw M12 81110133 21 Vise Jaw Washer AFB8B037 22 Screw M12 81110133 23 Roll Pin M8 5927 81132081 24 Lever Bushing AFB80032 25 Quick Lock Vise Lever AGB80031 26 Bea...

Page 23: ...71 Hex Nut M8 1 25 81573 72 Hex Nut M16 81600016 73 Head Lever 120C0004 74 Handgrip 44600001 75 Ring Nut M25 1 5 81700025 76 Worm Wheel ABB81005 77 Oil Seal 35x47x7mm 302849 78 Blade Shaft 060C0009 7...

Page 24: ...Motor 3 Phase CE 74320127 Motor Single Phase CE 74320122 1 140 Auxiliary Relay 72300000 141 Remote Control Switch 301462 142 Fuse Holder 73142005 143 Transformer 30VA 73327011 144 Socket Connector 736...

Page 25: ...ollowing 1 Unplug machine 2 Release the arch return spring 3 Empty coolant tank 4 Carefully clean and grease machine 5 If necessary cover the machine DISMANTLING THE MACHINE If this machine is permane...

Reviews: