background image

 

User Manual Labtec ECO

 

page 5

 

www.labtec.de

 

5. component description

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Test stand housing (A) 

 

Thanks to its ergonomic design, the test stand 

can be operated fatigue

-

free even during con-

tinuous operation. Operation in computer mo-

de is via PC keyboard and mouse or manually 

via the optionally available front panel

 

 

Front cover / Panel (only with Option T) (B) 

 

The  front  panel  contains  the  control  buttons 

and an OLED display showing measuring va-

lues and system information..

 

 

Multifunction test head (C) 

 

The test head is a fixed head that can be  in-

flated  by  an  electric  pump  so  that  full  face 

masks  of  any  brand  can  be  sealed  without 

problems. A measuring point is installed in the 

test  head  which  measures  the  internal  pres-

sure  in  the  mask  or  demand  valve.

 

 

The  Labtec  ECO  dynamic  model  has  a  se-

cond measuring point in the forehead area of 

the  head.  This  can  be  queried  via  the  soft-

ware.

 

 

Air supply / device connection (D)

 

The air supply can be provided optionally:

 

1.

 

Through  an  existing,  fixed  300  bar  pipe 

supply  via  a  6  mm  high

-

pressure  pipe 

fitting.

 

2.

 

Through an available 300 bar high pres-

sure  hose  for  connection  to  a  breathing 

air cylinder or pipe supply.

 

 

Attention:  Never  connect  or  disconnect 

lines under pressure !

 

 

Device connection (E)

 

High

-

pressure  device  socket  for  connecting 

the  pressure  regulator  of  the  SCBA  to  be 

tested.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CPS  test  connection  and  system  vent  (F)

 

Quick  coupling  for  filling  CPS.  For  all  other 

test  procedures,  the  coupling  must  be 

connected to the supplied  plug

-

in silencer for 

system venting.

 

 

Medium  pressure  device  connections  (G, 

H)

 

Quick  coupling  for  connecting  the  medium 

pressure  line  of  the  demand  valve  to  be 

tested.

 

Plug  nipple  for  connecting  the  medium  pres-

sure line of SCBA  to be tested. 

 

 

Power connection (I)

 

On the left side of the housing there is a C13 

power  plug  coupling  for  the  connection  of  a 

cold appliance cable with C14 plug.

 

 

USB

-

Interface (J)

 

The USB port for data  transfer to a PC is  lo-

cated on the left side of the housing. 

 

 

Artifical Lung

 

Labtec  ECO  dynamic

 

devices  contain  the 

artificial lung, which is continuously adjustable 

in  stroke  and  breathing  frequency.  The  desi-

red respiration can be infinitely adjusted in the 

software  in  the  stroke  from  5  to  40  strokes/

min and in the volume from 0.5 to 3.5 litres.

 

 

Vacuum pump 

 

With  the  built

-

in  vacuum  pump,  the  required 

air  currents  are  generated  and  the  probe  is 

inflated  or  deflated.  The  desired  air  flow  rate 

can  be  set  in  the  software  from  0.5  to  10  l/

min.

 

A

 

B

 

C

 

F

 

J

 

I

 

D

 

G, H

 

E

 

Summary of Contents for ECO static

Page 1: ...ec de User Manual Labtec ECO static dynamic Labtec No Content Page 1 foreword 2 2 safety instructions 2 3 device description 3 4 technical data 4 5 component description 5 6 operating elements 6 7 com...

Page 2: ...ained and certified Labtec service technician and tested and calibrated by him or her using a Labtec calibration device The list of current certified employees trai ning partners and service technicia...

Page 3: ...PC connec ted to test device via swivel arm mounting incl pre installed LabNet Profi test software Module S safety valve test System com ponent and module for automatic medium pressure increase for SC...

Page 4: ...on bar 0 25 0 5 low pressure sensor measuring range precision mbar 50 0 50 0 05 complete device Max permissible operating pressure bar 400 power supply V Hz 230 240 50 60 total power electricity W max...

Page 5: ...linder or pipe supply Attention Never connect or disconnect lines under pressure Device connection E High pressure device socket for connecting the pressure regulator of the SCBA to be tested CPS test...

Page 6: ...switches it off Switch button for 10 l m inhalation Forcing pump 10 l min is set in motion by pressing this button LED shows function Pressing button again switches it off Switch button for CPS infla...

Page 7: ...atus is screwed completely into the inter nal thread of the device connection For tests in the medium pressure range dis connect the medium pressure line of the SCBA at the Euro coupling and connect i...

Page 8: ...C Guideline 2016 42 EG and EMC 2014 30 EU including all changes and addendums to date thereto The above mentioned product meets the following standards and guidelines Nous Vous Confirmons que l appare...

Page 9: ...h head inflation button The inflation time varies from mask type to mask type 1 2 3 Set test vacuum with negative pressure button to setpoint value mbar Switch on stop watch Adjust the test pressure w...

Page 10: ...r a preset time min read the pressure change on the display LP and compare with the setpoint 2 1 5 Completely vent the test device All further tests require high pressure Check correct device connecti...

Page 11: ...ith main valve switch 2 2 7 Completely vent the test device 2 4 1 Connect demand valve in combination with a SCBA base unit to the test device Check correct device connection 2 4 2 Open high pressure...

Page 12: ...t pressure until PA pressure gauge shows the set point Read off the SCBA manometer 3 1 5 Read the high pressure on the display HP and compare it with instrument pressure opt Repeat test steps 3 1 4 an...

Page 13: ...test device 5 3 1 Connect demand valve in combination with a SCBA base unit to the test device Check correct device connection 5 2 1 Open high pressure main valve with main valve switch High pressure...

Page 14: ...ation with a SCBA base unit to the test device Check correct device connection 5 4 2 Open high pressure main valve with main valve switch High pressure flows into the unit 5 4 3 Close high pressure ma...

Page 15: ...des Schalters CSA f llen das Bef llen des Anzugs stoppen when the required tightening internal pressure is reached 7 1 8 Press the CPS inflation switch again to stop fil ling the suit Setting the requ...

Reviews: