background image

 

User Manual Labtec ECO

 

page 15

 

www.labtec.de

 

A 4 Testing of gas

-

tight chemical protective suits (CPS)

 

7

 

Tightness

 

7.1 

 

Tightness of the suit

 

 

8

 

Valves

 

8.1 

 

Tightness of the suit valves after # min. at 

-

 # mbar 

 

 

(repeat the test depending on the number of valves)

 

Step

 

Activity

 

Comment

 

operating 

elements

 

7.1.1

 

Close the high

-

pressure device connection with 

a plug.

 

Device connection must be closed 

during tightness test.

 

 

7.1.2

 

Connect one tightening valve with test adapter, 

seal all other tightening valves with plugs.

 

CPS test adapter CGA 200 and brand

-

specific adapters

 

 

7.1.3

 

Couple the filling hose of the test adapter with 

plug nipple of CPS test connector.

 

CPS test adapter CGA 200 

 

 

7.1.4

 

Insert the measuring hose of the test adapter 

into the mouth of the test head.

 

CPS test adapter CGA 200 

 

 

7.1.5

 

Open high pressure main valve with main valve 

switch.

 

High pressure flows into the unit and 

is present in the unit.

 

 

7.1.6

 

Fill CPS by pressing the CPS inflation switch

 

CPS is filled to +# mbar

 

 

7.1.7

 

Durch erneutes Drücken des Schalters 

CSA 

füllen 

das Befüllen des Anzugs stoppen.

 

when the required tightening internal 

pressure is reached.

 

 

7.1.8

 

Press the CPS inflation switch again to stop fil-

ling the suit.

 

Setting the required settling time.

 

 

7.1.9

 

When time has elapsed, set the required test 

pressure with the CPS inflation or CPS deflation 

switches and start the stopwatch.

 

 

 

7.1.10

 

After a preset time of # min, read the low pres-

sure on the display (LP) and compare with the 

previously set test pressure. 

 

Compare difference value with per-

missible deviation.

 

 

7.1.11

 

Close high pressure main valve with main valve 

switch.

 

 

 

7.1.12

 

Completely vent the test device.

 

Open the suit

 

 

 

 

 

 

8.1.1

 

Insert the measuring hose of the test adapter 

into the mouth of the test head.

 

CPS test adapter CGA 200 

 

 

8.1.2

 

Connect tightening valve with valve test adapter 

from inside

 

manufacturer

-

dependent adapter,

 

depending on the number of

 

existing valves. 

 

 

8.1.3

 

Set test vacuum with negative pressure button to 

setpoint value 

-

 # mbar. Switch on stop watch.

 

Adjust the test pressure with the low 

pressure relief button if necessary.

 

 

8.1.4

 

After a preset time of # min. pressure change 

read off the display (LP) and compare with set-

point.

 

 

 

8.1.5

 

Completely vent the test device.

 

 

 

Summary of Contents for ECO static

Page 1: ...ec de User Manual Labtec ECO static dynamic Labtec No Content Page 1 foreword 2 2 safety instructions 2 3 device description 3 4 technical data 4 5 component description 5 6 operating elements 6 7 com...

Page 2: ...ained and certified Labtec service technician and tested and calibrated by him or her using a Labtec calibration device The list of current certified employees trai ning partners and service technicia...

Page 3: ...PC connec ted to test device via swivel arm mounting incl pre installed LabNet Profi test software Module S safety valve test System com ponent and module for automatic medium pressure increase for SC...

Page 4: ...on bar 0 25 0 5 low pressure sensor measuring range precision mbar 50 0 50 0 05 complete device Max permissible operating pressure bar 400 power supply V Hz 230 240 50 60 total power electricity W max...

Page 5: ...linder or pipe supply Attention Never connect or disconnect lines under pressure Device connection E High pressure device socket for connecting the pressure regulator of the SCBA to be tested CPS test...

Page 6: ...switches it off Switch button for 10 l m inhalation Forcing pump 10 l min is set in motion by pressing this button LED shows function Pressing button again switches it off Switch button for CPS infla...

Page 7: ...atus is screwed completely into the inter nal thread of the device connection For tests in the medium pressure range dis connect the medium pressure line of the SCBA at the Euro coupling and connect i...

Page 8: ...C Guideline 2016 42 EG and EMC 2014 30 EU including all changes and addendums to date thereto The above mentioned product meets the following standards and guidelines Nous Vous Confirmons que l appare...

Page 9: ...h head inflation button The inflation time varies from mask type to mask type 1 2 3 Set test vacuum with negative pressure button to setpoint value mbar Switch on stop watch Adjust the test pressure w...

Page 10: ...r a preset time min read the pressure change on the display LP and compare with the setpoint 2 1 5 Completely vent the test device All further tests require high pressure Check correct device connecti...

Page 11: ...ith main valve switch 2 2 7 Completely vent the test device 2 4 1 Connect demand valve in combination with a SCBA base unit to the test device Check correct device connection 2 4 2 Open high pressure...

Page 12: ...t pressure until PA pressure gauge shows the set point Read off the SCBA manometer 3 1 5 Read the high pressure on the display HP and compare it with instrument pressure opt Repeat test steps 3 1 4 an...

Page 13: ...test device 5 3 1 Connect demand valve in combination with a SCBA base unit to the test device Check correct device connection 5 2 1 Open high pressure main valve with main valve switch High pressure...

Page 14: ...ation with a SCBA base unit to the test device Check correct device connection 5 4 2 Open high pressure main valve with main valve switch High pressure flows into the unit 5 4 3 Close high pressure ma...

Page 15: ...des Schalters CSA f llen das Bef llen des Anzugs stoppen when the required tightening internal pressure is reached 7 1 8 Press the CPS inflation switch again to stop fil ling the suit Setting the requ...

Reviews: