7) 

ASSEMBLY AND PREPARATION 

 
FITTING SD-06 TO STAND*. 
 

If the SD-06 is to be fitted onto the optional stand it is better to do this before fitting any other items. 
 
1.  Lay the SD-06 face down on the floor with some protection to prevent damage to the front face 

of the top section. 

 
2.  Remove the three screw in feet  from the base of the SD-06. 
 
3.  Position the stand next to the SD-06 base and using the three screws provided screw the stand 

firmly to the base of the SD-06. It is better to fit all three screws before tightening up with a 
suitable Allen Key ( not provided). 

 
4.  Fit the three “screw in feet” into the stand, screw the feet fully in to give maximum stability. 
 
5.  Using two people stand the unit upright, adjust the feet if necessary to ensure vertical alignment. 

 

* the stand is available as an optional accessory 

 

FITTING GLASSWARE. 
 

a)  The main chamber  fits into the U shaped clamp  on the left hand side of the unit, slacken the 

two black knobs and slide the main chamber in towards the central control panel. Lightly tighten 
the two black knobs, with the 90° outlet of the main chamber passing below the control panel. 

 

b)  The cyclone fits directly into the exhaust stack to the right of the control panel. Loosen the 

knurled cap on the end of the exhaust stack. Enter the top of the cyclone into the cap, push the 
cyclone upwards. There will be some resistance as the glass tube slides up through a rubber 
seal. 
Rotate the cyclone 90° to pass the inlet flange over the black nylon support arm. Move the 
cyclone down allowing the inlet flange to rest on the support arm. 

 

c)  The white PTFE transition tube  fits between the outlet flange of the main chamber and the inlet 

flange of the cyclone. Using the two clamps fasten the main chamber, transition tube and 
cyclone together, tighten clamps finger tight only. 

 

d)  Finally position glassware and tighten knurled ring on the exhaust stack and the two black knobs 

holding the main chamber. 

 

Summary of Contents for SD-06

Page 1: ...4 Components Included 5 Packing List 6 Connection to Electrical Supply 7 Assembly and Preparation 8 Controls 9 Jet Spray Assembly 10 Operation 11 General Advice and Useful Hints 12 Optional Accessorie...

Page 2: ...r is the result of more than 30 years of continuous development The SD 06 has been designed primarily for simplicity and ease of use rapid assembly and disassembly for cleaning minimal maintenance eff...

Page 3: ...ble to expose any person to hazardous solids liquids dusts vapours gases or micro organisms You are also required to introduce suitable procedures for handling these substances and to keep appropriate...

Page 4: ...or Residual Current Circuit Breaker RCCB to protect the operator from electric shock in the event of misuse or accident e Potential hazards should always be the first consideration when deciding on a...

Page 5: ...S2023 PTFE Transition Piece 1 SDS2031 Silicone Tube 4 8mm bore x 1 6mm wall 2 0 m SDS2022 Exhaust Tube 1 7 m Nylon Tube 4mm fitted to unit 1 0 m Nylon Tube 6mm fitted to unit 1 0 m The above comprises...

Page 6: ...he U shaped clamp on the left hand side of the unit slacken the two black knobs and slide the main chamber in towards the central control panel Lightly tighten the two black knobs with the 90 outlet o...

Page 7: ...y and the blue nylon tube into the push in fitting at the top of the assembly The silicone tube for the liquid sample is fitted to the grooved inlet The remaining tube is fitted through the pump and t...

Page 8: ...on is used in the set De Blocker screen to change the De Blocker from Slow to Medium or Fast 7 The next button is active on all screens and is used to select the next screen 8 The Stop button is activ...

Page 9: ...lowing procedure De blocker inlet A Sample Inlet B Atomising air inlet C Open the hinged plastic cover of the pump and leaving sufficient tube to connect to the jet when it is in the top chamber inser...

Page 10: ...p setting screen The information indicates pump speed on a nominal 50 scale For appropriate flow rates in ml hr please see the chart on Note II The compressed air pressure setting is factory set to a...

Page 11: ...l times on the set temp screen A fixed over temperature protection cut out is fitted and will actuate at approximately 300 C if actuated allow to cool down and re start allow inlet temperature to stab...

Page 12: ...llow the main chamber a few minutes to heat up The inlet temperature may show the required setting but the glassware and main chamber will be quite cool for a few minutes Wait until inlet temperature...

Page 13: ...15 ml hour 45 RPM 1895 ml hour 40 RPM 1665 ml hour 35 RPM 1500 ml hour 30 RPM 1305 ml hour 25 RPM 1090 ml hour 20 RPM 900 ml hour 15 RPM 695 ml hour 10 RPM 485 ml hour 5 RPM 280 ml hour SD 06 Drying A...

Page 14: ...a logging 13A MAINTENANCE Regular maintenance of any equipment ensures maximum trouble free life Customers are recommended to carry our simple maintenance at regular intervals the most basic of which...

Page 15: ...00mm long SDS2024 Chimney Extension required when using SDS2020 SDS2022 Cyclone SDS2023 PTFE Connection Tube SDS 0021 Clamp for Chamber Cyclone to PTFE Connection Tube SDS2006 Sample Collection Bottle...

Page 16: ...g the details below UK Office Keison Products P O Box 2124 Chelmsford Essex CM1 3UP England Tel 44 0 330 088 0560 Fax 44 0 1245 808399 Email sales keison co uk Please note Product designs and specific...

Reviews: