10
Chapter 3: Getting Started
to properly support it. The front of the enclosure should be aligned
within 0.30" (8mm) of the front of the work surface. Mounting
holes are provided in the Labconco accessory work surfaces to
secure the enclosure.
Work Surface Specifications
The work surface should be smooth, rigid and durable, such as a
chemical-resistant epoxy resin. The surface should be non-porous
and resistant to the materials used in conjunction with the Purifier
Filtered PCR Enclosure. The work surface should also contain a
dished recessed area for containing primary spills.
Filtered PCR Enclosure Work Surface Installation
1. Level the base cabinet or stand and the work surface. See
Figure 3-1.
2. Position the work surface in its intended location and with
the front of the work surface towards you. (Rear mounting
holes are located close to the rear edge.)
3. Secure the work surface to the base cabinet or stand with a
structural adhesive or silicone sealant.
4. Insert the supplied mounting screws in the four holes.
Allow a minimum of 1/8" clearance under the head of the
screw for positioning the enclosure.
5. Place the enclosure on the work surface and slide the rear
flange and front air foil flanges under the mounting screw
heads.
6. Tighten the four screws to complete the installation.
Summary of Contents for 3970202
Page 2: ......
Page 23: ...18 Chapter 4 Performance Features and Safety Precautions Figure 4 3 UV Sash Closure 16...
Page 58: ...53 Appendix B Dimensions and Exhaust Options Figure B 1 Purifier Filtered PCR Enclosure...
Page 60: ...55 Appendix C Filtered Enclosure Specifications C 1...
Page 61: ...56 Appendix C Filtered Enclosure Specifications C 2...
Page 62: ...57 Appendix C Filtered Enclosure Specifications C 3...
Page 63: ...58 Appendix C Filtered Enclosure Specifications C 4...
Page 65: ...60...
Page 66: ......