![Laars NEOTHERM NTH Series Installation And Operation Instructions Manual Download Page 34](http://html2.mh-extra.com/html/laars/neotherm-nth-series/neotherm-nth-series_installation-and-operation-instructions-manual_3351206034.webp)
Page 34
LAARS Heating Systems
Lead Boiler
Figure 17. Wiring Diagram for Lead Lag Connections
TO CASCADING
UNITS 3 THRU 8
(TYP)
7.F Lead Lag Connections
These boilers can be connected in a lead / lag series
up to a total of 8 residential Units. One as the Lead
control and 7 more as the following controllers.
For general info and menu set-up for Lead Lag using
your units Touchscreen, See page 49
‘About Lead Lag’.
Summary of Contents for NEOTHERM NTH Series
Page 4: ...LAARS Heating Systems...
Page 24: ...Page 24 LAARS Heating Systems Figure 9 Hydronic Piping Single Boiler Zoning with Circulators...
Page 33: ...Page 33 NEOTHERM Residential Boilers Figure 16 Control Panel Layout...
Page 38: ...Page 38 LAARS Heating Systems Figure 19 Ladder Diagram 7 H Ladder Diagram...
Page 67: ...Page 67 NEOTHERM Residential Boilers Figure 44 Heat Exchanger Components 68A 65 67 60 66 63 64...
Page 68: ...Page 68 LAARS Heating Systems Figure 45 Electrical Components...
Page 82: ...LAARS Heating Systems Notes...