background image

 

LAARS Heating Systems

Page 12

     Vertical vents of the induced draft JVH boilers must 

be installed in accordance with the code requirement 

for Category 1, Fan Assisted Appliances. Follow the 

requirements as indicated in the latest edition of ANSI 

Z223.1/NFPA 54, sizing of Category I Venting System 

and Appendix G, or in Canada, follow the instruction 

of CAN/CGA-B149 installation code.

     An unused lined chimney can be used as a raceway 

for single wall vent pipe, 

(see Figure 3)

. Never run 

vent pipe through a flue that has another appliance 

attached to it.

3D-1.   Horizontal Venting - Category III 

 

(JVH only)

     When venting is horizontal, or cannot meet the 

requirements of Category I, it can develop positive 

pressure and must be installed in accordance with 

this section and the specific vent manufacturer’s 

instructions. Common venting is not allowed in 

Category III systems. 

Figure 5. Horizontal Venting.

OUTSIDE WALL

VENT

SYSTEM

SHEET METAL

SCREWS

THIMBLE

BOILER

12" (305mm)

MIN.

BOILER VENTING

DETAIL

CAULK ENTIRE

JOINT, INCLUDING

THE SCREWS

*WHEN HORIZONTAL RUN

EXCEEDS 5 FT. (1.5m)

VENT TERMINAL

HOOD

*

3D-2.  Vent Connections (JVH only)

     The vent system 

must be gas tight

. All seams and 

joints must be sealed with silicone sealant or adhesive 

tape having a minimum temperature rating of 400°F 

(204ºC)

.

 Use at least three corrosion resistant screws at 

each slip joint, when required.

     For best results, horizontal vent systems should 

be as short and straight as possible. Material of vent 

connectors shall be as follows:

Description

Manufacturer

Product

High Temperature 

RTV

Dow Corning

Trade Mate

2" (51mm) wide

Aluminum foil tape

- adhesively backed

Venture

Product 

#3243

2" (51mm) wide

Aluminum foil tape

- adhesively backed

3M

Product #433

Vent Sealing Materials.

 

Materials

Vent Length

  In U.S.A.: 

UL type 304, 316 or 294-C 

stainless steel or equal 26 gauge minimum. 

 

In Canada:

 Use "BH-Type" vent 

material certified to ULD-S636 Class I 

(more than 135

°

C, but not more than 245

°

flue gas temperature), made of AL29-4C 
stainless steel or equal. 

Up to a maximum 

of 55' (17m) of 

equivalent pipe run 

(including required 

elbows). 

Do not use plastic venting of any kind.

 

 

    The boiler vent collar must be fastened to the vent 

pipe with rustproof metal screws no longer than 1/2” 

(13mm) and sealed with high temperature (500ºF / 

260ºC) silicone sealant. For larger diameter vent pipes, 

use a sealed reducer fastened directly to the boiler 

collar and seal all joints as indicated in 

Figure 5

Allow the sealant to cure for 24 hours before operating 

the boiler.

     

The entire vent system must not exceed the size 

specified in 

Table 6.

     

The following criteria must be observed:

1.  Attach a vertical pipe at least 12” (305mm) high 

to the boiler outlet before the horizontal run if 

run exceeds 5 feet 

(see Figure 5

).

2.  Support the vent run at 3’ (.9m) intervals with 

overhead hangers.

Size

Diameter

No. of

Elbows

Horizontal Run Length

in.

mm

ft.

m

50 - 160

4

102

4

35

10.7

225

4

102

2

10

3.0

225

6

152

4

35

10.7

For each elbow eliminated, add 5’ (1.5m) of allowable vent. 

Table 6. Horizontal Venting Configuration.

3.  Pitch down the vent run, toward the vent terminal 

(hood), 1/4” per foot (20mm per meter).

4.  Do not locate any joint screws at the bottom of 

the vent run.

3D-3.   Vent Termination (JVH only)

     The side wall vent terminal (hood), Laars Part 

Summary of Contents for Mini-Therm JVH

Page 1: ...your gas supplier from a nearby phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department Installation and service must be performed by a qualified i...

Page 2: ...ections 4A Gas Supply and Piping 13 4B Special Precautions for LP 15 SECTION 5 Water Connections 5A Water Piping 15 5B By pass Piping 17 5C Adjusting the bypass 17 5D Alternate Auto Bypass Operation 1...

Page 3: ...ay void the warranty If field conditions require modifications consult the factory representative before initiating such modifications ATTENTION L eau chaude chaudi re doit tre install en conformit av...

Page 4: ...or 0 5 000 Propane H 2 001 5 000 Natural I 5 001 8 000 Natural and Propane J 8 001 10 000 Natural and Propane 11th Character Country U USA Canada 12th Character Revision 2 Second Revision 1C Heater I...

Page 5: ...of the boiler and the closet door when it is closed see Figure 1 2C Flooring JVS model boilers can only be installed on noncombustible flooring JVH model boilers are designed and certified for install...

Page 6: ...nnection Gas Connection in mm in mm in mm 50 75 100 125 160 225 13 3 8 13 3 8 16 7 8 16 7 8 20 3 8 25 5 8 340 340 429 429 518 651 3 1 8 2 1 4 5 3 4 5 1 2 7 1 4 10 79 57 146 140 184 254 2 7 8 2 2 7 8 2...

Page 7: ...4 1 2 75 13 3 8 340 27 3 4 710 24 1 8 610 21 3 4 550 27 1 2 700 5 13 1 1 4 1 2 100 16 7 8 430 28 3 4 730 24 1 8 610 22 3 4 580 27 1 2 700 5 13 1 1 4 1 2 125 16 7 8 430 28 3 4 730 23 5 8 600 22 3 4 58...

Page 8: ...long as the minimum clearances are observed See Table 2JVH and Figure 1JVH for clearances required for the Mini Therm JVH See Table 2JVS and Figure 1JVS for clearances required for the Mini Therm JVS...

Page 9: ...f a blower is necessary to provide adequate combustion air to the boiler a suitable switch or equivalent must Figure 2 Chimney Venting Figure 3 Vertical Venting CHIMNEY LINER THIMBLE VENT SYSTEM BOILE...

Page 10: ...ocated to prevent interference with the inducer damper Do not weld the vent pipe to the boiler collar The weight of the stack must not rest on the boiler The boiler top must be easily removable for no...

Page 11: ...to nationally recognized standards see National Building Code or ANSI NFPA 211 4 The boiler must not be connected to a fireplace wood stove or other solid fuel burning equipment 5 When the boiler and...

Page 12: ...oduct High Temperature RTV Dow Corning Trade Mate 2 51mm wide Aluminum foil tape adhesively backed Venture Product 3243 2 51mm wide Aluminum foil tape adhesively backed 3M Product 433 Vent Sealing Mat...

Page 13: ...spect the venting system for proper size and horizontal pitch and determine there is no blockage or restriction leakage corrosion or other deficiencies which could cause an unsafe condition Section 4...

Page 14: ...are not followed Attention Vous endommagerez la soupape de gaz si vous ne respectez pas les proc dures suivantes 3 Use the figures in Table 7 to size the gas inlet piping from the gas meter to the he...

Page 15: ...ng of the boiler 6 Disconnect the boiler and its individual shutoff valve from the gas supply system during pressure testing of the system at pressures higher than 1 2 pounds per square inch psi 3 45...

Page 16: ...System Primary Secondary Multi Zone Valve System Low Temperature Installation JV JV JV JV JV JV Primary Secondary Multi Zone Valve System KEY PUMP CHECK VALVE VALVE ZONE VALVE UNION AUTO AIR BLEEDER...

Page 17: ...nd snow melt systems 5C Adjusting the bypass Refer to Figure 10 Provide a means of measuring temperature on the inlet pipe to the boiler such as using a strap on or infrared thermometer Starting with...

Page 18: ...rculator and or primary secondary piping are required Consult factory 1 Chart is based on 30 F 17 C maximum temperature rise 2 Calculations are based on Type L copper tubing with one zone valve and ei...

Page 19: ...Valve Pump From System To System Tempering Valve with System Loop and Boiler Loop Pump JV Pump Isolation Valve Isolation Valve Tempering Valve Pump From System To System Primary Secondary System Loop...

Page 20: ...ollow the schematic in Figures 10A and 10B Remove the wire nut from the two sets of wires and connect the hot lead from the 115V power supply and the neutral lead to the white wires 4 Attach the leads...

Page 21: ...UNLESS VENT DAMPER IS TO BE INSTALLED LA CHAUDI RE NE FONCTIONNERA PAS SANS LE VOLET MOTORIS AUTOMATIQUE LE F AISCEAU DE C BLES DU VOLET MOTORIS DOIT TRE INS R DANS LA PRISE DU VOLET MOTORIS AU CANADA...

Page 22: ...az Switch Limiteur Gas Valve HW VR8304 Air Puls Voir Manuel Prise De Ventilation See Doc 1077 Power Venter Receptacle High Limit Limite Sup rieure Veilleuse Electrode Sensor with Spark Pilot Burner TH...

Page 23: ...OL FAN PROVING ROLLOUT SW GAS VALVE R 2 4 GND R BL R N JVH BK TEMP CONTROL BOILER PUMP TRANSFORMER 110V 110 VAC FUSE 1 BR INDUCER FAN TEMP CONTROL CONTROL RLY CONTROL RLY 24V 3 1 TEMP CONTROL HI LIMIT...

Page 24: ...LAARS Heating Systems Page 24 COM HEAT Figure 11 Multiple Zone Wiring Wiring with Taco Zone Valves Wiring with Honeywell Zone Valves Wiring with Multiple Zone Pumps COM HEAT COM HEAT...

Page 25: ...re falls below the wall thermostat setting the cycle will repeat Section 7 7A Filling the System It is crucial to the efficient operation of the system that all air be removed from the circuit For thi...

Page 26: ...LAARS Heating Systems Page 26 8C Operating Instructions Mini Therm JVH...

Page 27: ...Mini Therm JV Page 27 8D Operating Instructions Mini Therm JVS...

Page 28: ...ollowing data are used to calculate the target setpoint from the outdoor temperature 1 The heating curve or reset ratio RR is set by the potentiometer with a range of 0 4 to 3 6 2 The room temperature...

Page 29: ...heat exchanger is caused by incomplete combustion and is a sign of venting and or combustion air problems The heat Section 9 9A Maintenance 1 Lubricate the water circulating pump per the instructions...

Page 30: ...e terminal board Turn the wall thermostat high enough to call for heat If the meter fails to register 24 volts the thermostat or its circuit may be defective 5 Place the second lead on the purple wire...

Page 31: ...Boiler pounding or knocking Too low water flow through boiler Check temperature rise between inlet and outlet boiler piping 15 F 8 C to 25 F 14 C temperature rise is recommended If temperature rise is...

Page 32: ...UNPLUG IGNITER MEASURE VOLTAGE AT TWO BOTTOM TERMINAL OF SV9501 SV9601 24 VAC NOMINAL YES YES YES YES YES NO NO NO YES NO NO NO Troubleshooting Honeywell SV9501 SV9601 Hot Surface Pilot System JVH on...

Page 33: ...diation Isolation Valve Used to isolate the boiler from the circuit It minimizes the amount of water drained from the system Primary Secondary Piping Two or more interconnecting circulating loops each...

Page 34: ...00 Outdoor Sensor not shown E2347400 E2347400 E2347400 E2347400 E2347400 E2347400 Water System 14 Heat Exchanger R0402007 R0402008 R0402009 R0402010 R0402011 R0402012 15 Gauge Temperature Pressure A20...

Page 35: ...Page 31 ITEMS14 39 AND INSULA TION NOT SHOWN left side right side Figure 14A JVH Parts Identification 25 26 22 25 16 15 27 35 33 38 32 32 17 14 19 20 34 3 28 1 2 6 5 9 23 24 37 36 29 10 31 18A 18B 4 1...

Page 36: ...400 E2347400 E2347400 E2347400 E2347400 Water System 11 Heat Exchanger R0402001 R0402002 R0402003 R0402004 R0402005 R0402006 12 Pressure Relief Valve 30PSI R0061400 R0061400 R0061400 R0061400 R0061400...

Page 37: ...Page 37 Mini Therm JVS on left side Figure 14B JVS Parts Identification 19 17 18 20 7 8 5 22 23 2 24 26 13A 13B 3 1 4 29 14 11 12 25 28 26 21 16 15 9 6 27...

Page 38: ...stomer Service Service Advisors 20IndustrialWay Rochester NH03867 603 335 6300 Fax603 335 3355 ApplicationsEngineering 1869 Sismet Road Mississauga Ontario Canada L4W 1W8 905 238 0100 Fax 905 366 0130...

Reviews: