Perform Operational Test No. 1

   

Ensure the enclosure door is closed prior to performing 
operation test.

 

   

 

 

Set the 3-pole switch or circuit breaker to the ON 
position.

 

 

 

Press the up or down arrow keys to adjust the set 
temperature. The controller displays the temperature 

of water measured at the outlet.

 

 

   

 

Start the water flow through the heater by starting 
the process or fixture this heater is connected to in 
order to activate heater. 

 

 

Test water temperature and stability at outlet by 
viewing the display (in red) the temperature of water 
exiting the heater. 

 

   

 

 

When flow rate reaches approximately 

0.5gpm 

(1.9lpm), the flow sensor recognizes this condition

 

and begins the heating process. 

When the flow switch activates: 

 

 

The display changes from OFF to the output 
temperature, verifying power supply connection to 
the heating elements via the triac switches. 

 

Element load lights may be solid or flash in unison 
as heating elements modulate depending on the 

hot water demand. 

 

Digital temperature controller sows water 
temperature. Additional programming is not 
necessary. 

 

 

Heater will not energize heating elements if the inlet 
water temperature is equal to or greater than the 

temperature set on the digital controller.

 

 

 

   

 

   

 

Perform Operational Test No. 2

         

Each model has precise specifications for temperature 
rise capabilities.

 

   

 

Turn on hot water faucet/fixture/process. The heater 

should activate immediately. 

 

 

Turn off hot water faucet/fixture/process. 

The flow switch will deactivate and shut off power to 
the heater. 

 

 
 
 

If the water flow exceeds maximum heating capacity of the heater, the temperature of water at the outlet may be lower 
than the temperature selected on the controller. See table below to determine maximum temperature rise capabilities. 

Temperature Rise (GPM & F°

)

 

208V, 240V, 

277V, 480V 

 kW  

1 gpm 

ΔT °F 

1.5 gpm 

ΔT °F 

2 gpm 

ΔT °F 

2.5 gpm 

ΔT °F 

3 gpm 

ΔT °F 

3.5 gpm 

ΔT °F 

4 gpm 

ΔT °F 

5 gpm 

ΔT °F 

6 gpm 

ΔT °F 

7 gpm 

ΔT °F 

LCTEH005 

34 

23 

17 

 

 

 

 

 

 

 

LCTEH006 

41 

27 

20 

 

 

 

 

 

 

 

LCTEH010 

10 

68 

45 

34 

27 

23 

20 

17 

 

 

 

LCTEH015 

15 

102 

68 

51 

41 

34 

29 

26 

 

 

 

LCTEH018 

18 

122 

82 

61 

49 

41 

35 

31 

 

 

 

LCTEH025 

25 

171 

114 

85 

68 

57 

49 

43 

34 

28 

24 

Temperature Rise (LPM & C°

)

 

208V, 240V, 
277V, 480V 

 kW  

3.8 lpm 
ΔT °C 

5.7 lpm 
ΔT °F 

7.6 lpm 
ΔT °C 

9.5 lpm 
ΔT °C 

11.4 lpm 
ΔT °C 

13.3 lpm 
ΔT °C 

15.1 lpm 
ΔT °C 

18.9 lpm 
ΔT °C 

22.7 lpm 
ΔT °C 

26.5 lpm 
ΔT °C 

LCTEH005 

19 

13 

 

 

 

 

 

 

 

LCTEH006 

23 

15 

11 

 

 

 

 

 

 

 

LCTEH010 

10 

38 

25 

19 

15 

13 

11 

 

 

 

LCTEH015 

15 

57 

38 

28 

23 

19 

16 

14 

 

 

 

LCTEH018 

18 

68 

46 

34 

27 

23 

19 

17 

 

 

 

LCTEH025 

25 

95 

63 

47 

38 

31 

27 

24 

19 

16 

13 

 

 

Summary of Contents for H Series

Page 1: ...TEH006 LCTEH010 LCTEHV010 LCTEH015 LCTEHV015 LCTEH018 LCTEHV018 LCTEH025 Voltage options 208V Single Three Phase 240V Single Three Phase 277V Single Phase 380V Three Phase 400V Three Phase 415V Three...

Page 2: ...allation 6 7 Electric Installation 8 Start Up Check List 9 Start Up 10 Digital Controller Operation 11 NEMA 4 4X Digital Controller Operation 12 Perform Operational Test No 1 13 Perform Operational Te...

Page 3: ...nnect power supply before performing any work in the enclosure Failure to ground this system may result in death or serious injury Make sure that all water supply lines have been flushed and then comp...

Page 4: ...0 F 60 C For applications utilizing quick close valves or solenoid valves it is important to install a hammer arrestor or surge tank close to the point of use to absorb pressure spikes Installation Co...

Page 5: ...and other plumbing for service maintenance Set heater in a vertical upright position with the water outlet located at top Depending on the application the unit may also be installed rotated clockwise...

Page 6: ...any drop to eliminate trapped air Install one union on the water inlet side of the heater and another union upstream of the 100 Mesh 150 micron y strainer Install one union on the water outlet side of...

Page 7: ...Installation 7 2 Plumbing Installation cont...

Page 8: ...Table 310 15 for 75 C insulated copper wire 30 C Ambient Aluminum wire requires larger gauges Not all available optional voltages are listed in the table For standard enclosures remove the four screws...

Page 9: ...nstalled after pressure and temperature relief valve on outlet if required by local or national plumbing codes If the hot water process is not at the highest point in the plumbing loop then an automat...

Page 10: ...ge elements and cause heater malfunction Turn on the connected process observe output temperature rise to setpoint On standard controller set point and output temperatures are located side by side On...

Page 11: ...the controller Keys and Displays Function Setpoint Up and Down Buttons In the Home Page adjusts the set point in the right display In other pages changes the upper display to a highter or lower value...

Page 12: ...e of the controller Keys and Displays Function Setpoint Up and Down Buttons In the Home Page adjusts the set point in the right display In other pages changes the upper display to a highter or lower v...

Page 13: ...he inlet water temperature is equal to or greater than the temperature set on the digital controller 9 Perform Operational Test No 2 Each model has precise specifications for temperature rise capabili...

Page 14: ...tuation FDS Fused Disconnect Internal fused disconnect interlocks with enclosure door when energized prohibiting access to a live cabinet Select the FDS option for an additional level of safety and co...

Page 15: ...ere hard water sediment is present in the water To clean the Y Strainer 1 Turn the power off at the circuit breaker panel 2 Shut off the installer supplied cold water isolation valve to the heater 3 R...

Page 16: ...mperature or faulty sensor Turn power off Check for loose or disconnected wires Check the incoming service connection Voltage must match name plate rated voltage Labels are located on the upper left o...

Page 17: ...urce A load voltage reading is also helpful Turn power OFF before recording any Ohm readings If the above steps do not solve the problem some additional checks may be performed Follow the schematic to...

Page 18: ...DC Option Pin Out D1 Option Pin Out Pin Name Description Pin Name Description T R 2 RS 485 Transmit Receive Non Inverting Input Output Negative 3 Return Current Path for Current Pin 4 3 Signal Ground...

Page 19: ...UINT RWES Remote Set Point Control Mode Process Value 1999 000 to 9999 000 F 1128 000 to 5537 000 C 402 402 Float R Process Value Control Mode OFF 62 Auto 10 Manual 54 1880 2360 Auto UINT RWES Contro...

Reviews: