![La Marzocco GB/5 Manual Download Page 19](http://html2.mh-extra.com/html/la-marzocco/gb-5/gb-5_manual_3117385019.webp)
EN
18
8. Mandatory Maintenance and Check-up Operations
These operations are in addition to the Maintenance and Periodic Cleaning Operations as speciied in Chapter 7.
The following maintenance and check-up operations should be carried out by a qualiied technician.
The time required for the periodic maintenance is determinated by the quantity of daily work and/or coffee consumption.
N.B. These periodic maintenance operations are not covered by warranty.
▪
Replace portailter baskets
▪
Inspect group valve plungers
▪
Inspect vacuum breaker
▪
Inspect expansion valve
▪
Inspect electrical wiring condition
▪
Inspect boilers safety switches
▪
Replace over-pressure valve (safety valve)
▪
Accurate control of the
tightness at 2,4Nm of each cable on the terminal block.
EVERY THREE/FOUR MONTHS
EVERY SIX/EIGHT MONTHS (in addition to the above)
EVERY YEAR (in addition to the above)
EVERY 3 YEARS (in addition to the above)
▪
Replace group gaskets
▪
Replace diffuser screens
▪
Clean auto-ill probe
▪
Check vacuum breaker for
proper operation
▪
Inspect water inlet valve
▪
Inspect drain system for leaks
or clogs
▪
Check low rate for each group
▪
Check brew temperature
▪
Check that brew pressure is
at 9bar
▪
Check all switches for proper
operation
▪
Check/note water hardness
(Water quality must be within the
range of parameters speciied in
the chapter on Installation,
otherwise warranty is voided)
▪
Check ilter basket condition
If AV Model:
▪
Check shot volumes
▪
Test lowmeter’s ohm value
(ohm value is acceptable if
greater than 1.8 K ohm, and
less than 2.2 K ohm
If MP Model:
▪
Rebuild MP valve
▪
Check the condition of the inside of boilers and if necessary rinse out with a proper cleaning product allowed for food and beverage
appliances.
▪
Rebuild steam assemblies