13
5.
Navigate to the
Days
fields, making sure the cursor surrounds the first hyphen (
[
- ]
). Press the
Enter
button and then press the link key that corresponds to
INCR
on the screen. The field will now show
MON
, indicating that this schedule
will be active every Monday from 6:00 AM to 5:00 PM. Repeat this process for
each of the remaining
Days
fields, except for
SAT
and
SUN
. Your screen should
now look like this:
6.
The week of Thanksgiving for 2012 is from Sunday, November 18
th
to Saturday,
November 24
th
. We want the unit to operate in Occupied mode each weekday
from 8:00 AM to 12:00 PM while the maintenance crew is in the building during
that week. We will need to set up a few Holiday schedules to accomplish this.
Since the unit normally runs in the Occupied mode from 6:00 AM to 5:00 PM on
weekdays, we need to set the Unoccupied periods in the Holiday schedules. The
Unoccupied period we want to schedule then is from 6:00 AM to 8:00 AM and
12:00 PM to 5:00 PM. We will use 10 Holiday schedules to accomplish this (two
for each weekday).
7.
Navigate back to the Schedules screen using the
FN + 7
hotkey. Move the cursor
to select the
Holiday
field and press Enter. Set the start time to
6:00 AM
and the
stop time to
8:00 AM
. Remember, the Holiday schedules represent the period
during which the unit is to be Unoccupied. Set the
Month
field to
11
(November)
and the
Day
field to
19
(Monday, the first weekday that week). Your screen
should now look like this:
8.
Press the link key corresponding to the
Next
field on the screen. This will take
you to Holiday Schedule 2. Set the start time for Holiday Schedule 2 to
12:00 PM
and the stop time to
5:00 PM
. Set the
Month
field to
11
(November) and the
Day
field to
19
(Monday, the first weekday that week). Your screen should now look
like this:
Repeat this step for the 20
th
, 21
st
, 22
nd
, and 23
rd
(Tuesday, Wednesday, Thursday,