K2 WST
®
enclosure
RIGGING MANUAL
VERSION 1.0
K2_RM_EN_1.0
w w w . l - a c o u s t i c s . c o m
1 4 / 52
4
SYSTEM SETUP
4.1
Ground-stacking
Final check
After the setup, always verify no yellow labels are visible on the front and on both sides of the array.
K2 enclosures on K1-SB
Stack as many K1-SB enclosures as necessary.
Refer to the
K1 rigging manual
to set up the K1-SB part of the array.
Position and attach a K2-BUMP on the K1-SB stack
Refer to
Position and attach an upside down K2 on the K2-BUMP and add as many K2
enclosures on top of the first one.
Refer to