All pipes should be inspected for leaks after assembly is
completed to prevent any defects or leaks.
y
All pipes other than the gas pipes should be insulated for
prevention against freezing after assembly is completed.
y
When connecting the pipes, after fixing the connetions
using the spanner, etc., connect it to the pipes.
y
Distributor Specifications
- Less than 5 holes : Inner diameter of over 36mm
- Over 6 holes
: Inner diameter of over 44mm
y
Distributor material
- Please use non-Corrosive material
- Do not use aluminum, carbon steel pipes, cast iron
materials since they are easily corroded.
y
Gas Meter Specifications
- 20,000
kcal/h or less : Over 3
level
- 25,000~35,000
kcal/h : Over 5
level
Standard Piping Diagram