30 | kvm-tec
kvm-tec | 31
2. INSTALLATION OF THE EXTENDER
2. INSTALLATION OF THE EXTENDER
2.8 START UP
To start up the system without switch:
1. Make sure that the two monitors and the computer are switched on.
2. If you are using a Network Switch, connect the power supply to an earthed wall socket.
3. Connect both extender
power supplies
(C) to an earthed wall socket. Both extenders will
start an initialisation process. The red status LED blinks a few seconds. After a few seconds
the status LED lights green. The monitor will displays your computer’s desktop or any open
applications.
2.9 REPLACING THE SFP MODULE
The masterEASy Fiber is delivered with a multimode SFP module.
To replace an SFP module with a different SFP module:
1. Remove the black dust protector from the SFP module.
2. Pull the metal latch of the SFP module forwards until it is at a right angle.
3. Replace the SFP module with the other module. Put the metal latch back in position. Only
use SFP modules from kvm-tec, or recommended by kvm-tec.
2.10 REMOVING A CATX CABLE
To remove a CATx cable:
• Press the latch down and slowly pull the cable out.
2.11 REMOVING A FIBER CABLE
To remove a fi ber cable:
• Press the latch down and slowly pull the cable out.
Summary of Contents for EASYLINE masterEasy
Page 44: ...86 kvm tec 11 NOTES ...