Preparations in the field
21
21
Preparations in the field
Preparations in the field
Lateral stone
guards
The stone guards must be set to the working position: to do this, make
sure that the pin (18) that limits movement of the guards is inserted in
the correct hole and secured with the cotter pin.
Adjust the side plates as follows:
> Remove the screws (19) securing the side plates (20) and position the
plates at the correct height from the ground according to the required
working depth of the harrow.
> Insert the screws and retighten.
> The stone guards should be adjusted in accordance with the position of
the roller, as shown in the figure below.
Adjusting the
working depth
To set "medium" working depth on the depth adjustment plates (21)
located on the right and left sides of the harrow:
> Remove the lock pins (22) from the square pins (23).
> Pull out the square pins (23) and reposition them in the "third hole" of the
centre row of the depth adjustment plates (21).
> Secure the square pins with their lock pins (22).
This adjustment can be changed in the field if required.
18
20
19