Delivery and preparation of the machine
12
12
Delivery and preparation of the machine
> Support the roller, observing safety rules
> Unscrew the nuts securing the arms and remove the bolts
Caution: suspended load hazard!
> Move the arms and the roller into the correct position (see figure) and
replace the bolts
> Replace the nuts and tighten
Positioning the
lateral stone guards
for work
The stone guards are secured in transport position for shipment; to
position the two stone guards in the correct working position, proceed
as follows:
> Remove the locking pin from the pivot pin (7)
> Remove the pivot pin (7) from the transport position hole
> Raise the stone guard
> Insert the pivot pin (7) in the working position hole
> Reinsert the locking pin in the pivot pin
Working position
Transport position
Working position
Transport position
7
7