78
Driving on the road
Fold in the frame prior to transport. Depending on the machine equip-
ment, the folding is accomplished as follows:
•
Hydraulically folding frame = fold using control panel
Prerequisites for folding:
•
The machine is coupled to the tractor and the tractor is secured
against rolling away.
•
The hydraulic and electrical connections have been made
Folding via the con-
trol panel
> Move both toggle switches for the frame to »ON«
> Actuate control valve on tractor.
Now fold the frame into the transport position.
> Actuate the control valve until the frame has folded in completely
Once the frame has been folded in:
> Release the control valve on the tractor
> Move both toggle switches for the frame to "OFF"
Frame, 6 metres PH
The transport locking device for the 6 m PH frame is secured with a
linchpin on the right-hand side of the frame.
Once the frame has been folded into the transport position:
> Remove the linchpin
> Fold the transport guard and fasten it on the left side and secure
with the linchpin
12 V
ON
OFF,
Right
Right
Right
Right
Toggle switch
for track marker
Toggle switch
for frame
Transport lok-
king device
Linchpin