Operation
21
Page 3
•
Activate the track marker on the left side.
•
Activate track marker on right side
•
Tramlines.
•
Calibration test
•
Basic settings
Turn to the next page.
Track marker
To fold the track marker the machine must be folded out and must be
in working position.
> To perform seeding work, preselect the track marker which has to
be opened out first. The symbol flashes.
> Actuate the control valve on the tractor. The track marker is ope-
ned out.
The flashing symbol indicates that the control valve is active. Lift out
the machine at the end of the field and actuate the control valve for
track marker. Lifting out the machine will cause the second track mar-
ker to be preselected automatically and lowered when the control val-
ve is actuated.
N
OTE
Passes for laying down tramlines automatically will only continue to be
counted if the track marker is actuated and the machine was raised.