
3-1
CHAPTER 3
Maintenance of the DL-2
This chapter describes preventative maintenance steps for
KVAL DL-2.
The content is geared to
guide technicians to keep a regular maintenance schedule for your KVAL machine. Keeping your
KVAL machine maintained is an important piece for successful operation of your door production
process.
Chapter 3 at a Glance
Maintenance Schedule
This section describes the assemblies to schedule for
maintenance.
• 300
Cycles
• 600
Cycles
• 3,000
Cycles
• 12,000
Cycles
• 72,000
Cycles
Lubrication
Requirements
This section describes the lubrication requirements for
the machine, including types of lube to use. This section
includes:
• Linear Bearings, Flange Bearing, and Pillow Blocks
• Gear Motor Lubrication Requirements
• Ball Screws
• Description of Air Input System
• Adjusting the Air Line Lubricator
• Priming the Air Line Lubricator
Changing or Adjusting
Bits
Procedure to change bits in the Cutter Head
Adjusting Drill Unit
• To Adjust Horizontally
• Depth
of
Drilling
• Adjusting the Bolt Plate Router
• Set Up for Wood Rail
Summary of Contents for DL-2
Page 4: ...KVAL DL 2 Operation Service Manual ...
Page 8: ...DL 2 Door Light Machine ...
Page 26: ...Safety Sign Off Sheet KVAL DL 2 Series Operation Service Manual 1 18 ...
Page 51: ...Using Templates 2 25 KVAL DL 2 Series Operation Service Manual ...
Page 62: ...Adjusting Drill Unit 3 11 KVAL DL 2 Series Operation Service Manual ...
Page 75: ...Troubleshooting with the Status Light Panel 4 13 KVAL DL 2 Series Operation Service Manual ...
Page 78: ...Notes ...
Page 79: ......