Maintenance Schedule
KVAL 700-DC Operation/Service Manual
3-2
Maintenance Schedule
Kval
recommends the following maintenance schedule to ensure that the machine operates prop
-
erly.
Daily, Monthly, Six Month Maintenance
Daily Preventive Maintenance
Op
Operation Description
Clean
Blow off dust from the entire machine.Wipe down the outside of the machine with a
clean dry cloth.
Check
Check tooling for wear.
Clean
Wipe off the photo eyes with a clean dry cloth, and check to ensure that all fastening nuts
are snug.
Check
Check the air pressure to make sure it is set at 80 psi to100 psi.
Clean
Empty any Dust Collection Units.
Check
Check for obstructed flow when excessive sawdust appears.
Check
Check the air filter water trap. Empty if full.
Weekly Preventive Maintenance
Op
Operation Description
Check
Check the machine for smooth motion through a complete door cycle
Clean
Clean linear bearings and the chrome shaft with a clean dry cloth, then lubricate.
Check
Check all air lines & electrical wiring for kinks or rubbing.
LUBE
Refill lubricator with an ISO 32 standard hydraulic oil (KVAL part# SYSLUBG)
Six Month Preventive Maintenance
Op
Operation Description
Clean
Wash filter and lubricator bowls with soapy water.
LUBE
Grease all bearings and tighten all bolts. Access to some grease fittings is difficult and
will require a special needle point grease tip (supplied with your system).
Clean
Clean and lubricate all slides and cylinder rods with dry silicone spray.
Tighten
Tighten all bolts.
Back-up
Backup computer software.
LUBE
Lubricate linear bearings and chrome shafts with silicone.
Summary of Contents for 700-DC
Page 4: ...Kval 700 DC Operation and Service Manual ...
Page 8: ...700 DC Operation and Service Manual Table of Contents ...
Page 50: ...Description of the Six Light Panel KVAL 700 DC Operation Service Manual 2 24 ...
Page 60: ...Description of Air Input System KVAL 700 DC Operation Service Manual 3 10 ...
Page 71: ......