36
3BA00226 • 2016-11-16 • Rev. 2
Ersa HR 200
5.
Commissioning
Before commissioning: Please make sure the contents of the package are complete.
Should components be damaged or incomplete, please contact your supplier.
5.1
Scope of delivery
0HR200:
• Hybrid Rework System HR 200
• Foot switch
• Power supply cable
•
Setting parameters chart
•
These operating instructions
0HR200-HP:
• Hybrid Rework System HR 200
• Foot switch
• Power supply cable
•
Heating plate with power cable and control wire
•
Setting parameters chart
•
These operating instructions
For further accessories, please refer to Chapter 9.
5.2
Before commissioning
■
Place the device on a flat, heat-resistant surface.
■
Connect power supply cable and foot switch
⑯
; please see pictures on page 2.
■
Put the IRHP100A heating plate (optional) on the base plate of the HR 200. Connect
the control wire to the cinch socket ⑭
and the supply power cable to the heating
plate.
Commissioning