6. - Putting into service
HRB122-152-182
41
KN135HGB_D
Power harrows
- Insert lower hitch pins and secure them with lynch
pins.
- Attach top link with hitch pin.
• Use tractor and machine attachment holes to
adjust the top link position.
- Secure hitch pin with lynch pin.
To obtain optimum PTO shaft angles and
tractor lift capacity, the top link must be
parallel to the lower links or slightly pointing
downwards towards the tractor.