Putting into service
Mower conditioner
FC4000RG
31
Primary PTO shaft
Friction slip clutch
The machine is fitted with a friction slip clutch.
- Uncouple the primary pto shaft from the tractor's PTO
stub:
• Remove 6 bolts (1).
- Remove cut-out clutch guard:
• Remove 3 bolts (2).
- Remove screw (3) and washer (4).
- Remove friction slip clutch.
- Loosen nuts to release friction discs (a).
- Let the friction discs slip for a few seconds (b).
- Tighten nuts until distance (L) is 34 mm (1.33’’) (c).
The friction slip clutch is ready to function.
Before the machine is put into service and
after a long period of non-use, check the
function of slip clutch to ensure it is not
locked up.
Do not fully tighten springs to prevent
damage on drive elements.
Loosen at least by 1/2 turn.
a
c
b
L
a
b
c
L
1
3
4
2
Summary of Contents for FC 4000 RG
Page 2: ......
Page 73: ...Appendix Mower conditioner FC4000RG 71 T Axle loads Tractor only T _______kg T _______kg...
Page 78: ......
Page 79: ......