Kübler Group
5 Commissioning and Operation
Manual IO-Link interface - R67071.0002 - 02
EN - 15
132146443
5.2 Quick Start Guide
5.2.1 Connection Setup
A tool of the IO-Link master manufacturer is required for operating the device. The screenshots
in this manual refer to the tool
IO-Link Master Control Tool
of the manufacturer
TEConcept
.
The IODD is required for general commissioning. The device description file (IODD) can be
downloaded from the website of the device manufacturer or by means of the IODD finder on the
ü
The IODD can be imported in the tool of the IO-Link master and the connection can sub-
sequently be set up.
a) Select the IODD