SERVICE WORK ON THE CHASSIS
50
–
Mount and tighten screw
.
Guideline
Screw, top steering stem
M8
17 Nm
(12.5 lbf ft)
Loctite
®
243™
–
Check the steering head bearing play. (
10.17
Adjusting play of steering head bearing
x
(EXC
‑
F EU/AUS)
–
Raise the motorcycle with the lift stand. (
100022-10
–
Loosen screws
and
.
–
Loosen and retighten screw
.
Guideline
Screw, top steering head
M20x1.5
10 Nm (7.4 lbf ft)
–
Using a plastic hammer, tap lightly on the upper triple clamp to avoid strains.
–
Fully tighten screw
.
Guideline
Screw, top triple clamp
M8
20 Nm
(14.8 lbf ft)
–
Tighten screw
.
Guideline
Screw, top steering stem
M8
20 Nm
(14.8 lbf ft)
–
Check the steering head bearing play. (
10.18
Greasing the steering head bearing
x
800010-10
(EXC
‑
F Factory Edition, EXC
‑
F SIX DAYS, XCF
‑
W SIX DAYS)
–
Remove the lower triple clamp.
–
Install the lower triple clamp.
x
(EXC
‑
F EU/AUS)
–
Remove the lower triple clamp.
–
Install the lower triple clamp.
x
10.19
Removing the shock absorber
x
–
Raise the motorcycle with the lift stand. (
600668-10
–
Remove screw
and lower the rear wheel with the swing arm as far as possible
without blocking the rear wheel. Fix the rear wheel in this position.
–
Remove screw
, push splash protector
to the side, and remove the shock
absorber.