background image

Operating Instructions 

Betriebsanleitung 

 
 
 
 
 

 

Bypass-Magnetschalter, Typ BGU-...I 

DE 

 

 

 

 

Bypass Magnetic Switch, Model BGU-...I 

EN 

 

     

 

 

 

 

Bypass Magnetic Switch, 

Types BGU-SI

 

 

 

 

 

OI

_

1

4

392375_B

GU_i

_20210708

 d

e

_

e

n

_

E

x

.d

o

c

x

 

Summary of Contents for BGU I Series

Page 1: ...Operating Instructions Betriebsanleitung Bypass Magnetschalter Typ BGU I DE Bypass Magnetic Switch Model BGU I EN Bypass Magnetic Switch Types BGU SI OI_14392375_BGU_i_20210708 de_en_Ex docx...

Page 2: ...starting any work read the operating instructions Keep for later use Vor Beginn aller Arbeiten Betriebsanleitung lesen Zum sp teren Gebrauch aufbewahren Manufacturer contact hergestellt von Sales cont...

Page 3: ...kte Ex i 26 9 2 2 Initiator Ex i 29 9 4 Typenschl ssel 31 English 32 1 General 32 2 Layout and Function 33 3 Safety 34 4 Transport packaging and storage 40 5 Commissioning Operation 41 6 Faults 49 7 M...

Page 4: ...itshinweise und Handlungsanweisungen Die f r den Einsatzbereich des Ger tes geltenden rtlichen Unfallver h tungsvorschriften und allgemeinen Sicherheitsbestimmungen einhal ten Die Betriebsanleitung is...

Page 5: ...it KSR Bypass Niveaustandanzeigern Typ BNA oder vergleichbarem Pro dukten bei einer vorher festgelegten F llstandh he eine Schaltfunktion auszu ben Hierzu k nnen einer oder mehrere Schalter an den Sta...

Page 6: ...eren Verletzungen f hren kann wenn sie nicht gemieden wird VORSICHT weist auf eine m glicherweise gef hrliche Situation hin die zu geringf gigen oder leichten Verletzungen bzw Sach und Umweltsch den f...

Page 7: ...influsst werden k nnen Abstand min 1 m Die Bypass Magnetschalter d rfen keinen starken mechanischen Belastungen Sto Verbiegen Vibrationen ausgesetzt werden Das Ger t ist ausschlie lich f r den hier be...

Page 8: ...ef hrdete Bereiche Die technischen Daten in dieser Betriebsanleitung sind zu beachten Im Betrieb ist darauf zu achten dass die maximale Umge bungstemperatur nicht berschritten wird Anspr che jeglicher...

Page 9: ...benut zen 3 4 Verantwortung des Betreibers Das Ger t wird im gewerblichen Bereich eingesetzt Der Betreiber unter liegt daher den gesetzlichen Pflichten zur Arbeitssicherheit Die Sicherheitshinweise di...

Page 10: ...ik und seiner Erfahrungen sowie Kenntnis der landesspezifischen Vorschriften geltenden Normen und Richtlinien in der Lage die beschriebenen Arbeiten auszuf hren und m gliche Gefahren selbst ndig zu er...

Page 11: ...Kurzzeichen nach IEC 60757 4 Notifizierte Stelle nach EU Richtlinie 2014 34 EU 5 Zertifikatsnummer und Ex Kennzeichnung Umgebungstemperatur 6 Schutzart nach IEC EN 60529 7 Seriennummer Baujahr 8 Artik...

Page 12: ...Transportsch den un tersuchen Offensichtliche Sch den unverz glich melden VORSICHT Besch digung durch unsachgem en Transport Bei unsachgem em Transport k nnen Sachsch den in erheblicher H he entstehen...

Page 13: ...feld im Schaltbereich durchgef hrt werden Hierzu ist der Magnet seitlich am Magnetschalter von unten nach oben zu f hren Hierbei muss der Kontakt umschalten Anschlie end ist der Magnet wieder von oben...

Page 14: ...ionen bzw Selbstentz ndungsvorg nge k nnen nur vom Medium selbst ausgehen nicht vom Ge r t Die Z ndgefahren des Mediums selbst m ssen vom Betreiber ber cksichtigt und verhindert werden 5 2 Montagevorb...

Page 15: ...eige von oben o der unten einschieben 3 Magnetschalter auf die H he des gew nschten Schaltpunktes verschie ben und durch anziehen der Schrauben befestigen Der Schaltpunkt ist auf dem Typenschild geken...

Page 16: ...e H he des gew nschten Schaltpunktes schieben und durch Anziehen der Schraube fixieren Der Schaltpunkt ist gekenn zeichnet Achtung Die Magnetschalter BGU AL und BGU AM werden mit 2 Spannb ndern befest...

Page 17: ...ten Ka bels sind bez glich des nachgeschalteten eigensicheren Steuerger tes zu beachten Es d rfen nur Kabel bzw Leitungseinf hrungen und Ver schlussstopfen mit einer EG Baumusterpr fbescheinigung nach...

Page 18: ...reis spannungslos schalten Deckel des Klemmengeh use bzw des Magnetschalters mit An schlussgeh use entfernen Kabel durch die Kabelverschraubung in das Klemmengeh use einf h ren Den Mantel abisolieren...

Page 19: ...Anschlussgeh use steht mindes tens eine Anschlussklemme f r den Potentialausgleich im oder und au en am Geh use zur Verf gung Bei Magnetschalter mit Kabel steht au en am Geh use eine Anschlussklemme...

Page 20: ...riebnahme sind die Magnetschalter in die Ausgangslage zu versetzen Hierzu ist der Schwimmer des Bypass Niveaustandanzeigers im Innern des Rohres langsam von unten nach oben und anschlie end wieder nac...

Page 21: ...Belegung mit Hilfe des An schlussbildes pr fen Reedkontakt defekt R cksendung ans Werk falsches Schaltverhalten Anschlussbelegung ndern Schaltposition falsch BGU neu positionieren Kabel abgerissen R c...

Page 22: ...len und nationalen Bestimmungen bez glich der Durchf hrung der Re paratur sind zu beachten Es d rfen nur Original KSR Kuebler Ersatzteile verwendet werden GEFAHR Beim Arbeiten an Beh ltern besteht Ver...

Page 23: ...hutzausr stung Ausgebautes Ger t sp len bzw s ubern um Perso nen und Umwelt vor Gef hrdung durch anhaftende Messstoffreste zu sch tzen 1 Vor der Reinigung das Ger t ordnungsgem vom Prozess und der Str...

Page 24: ...stoffreste zu sch tzen 8 1 Demontage Messger t nur im drucklosen und spannungsfreiem Zustand demontieren Gegebenenfalls muss der Beh lter entspannt werden 8 2 R cksendung Zur R cksendung des Ger tes d...

Page 25: ...Ex i Initiator Der Magnetschalter mit Initiator darf nur an einen bescheinigten eigensi cheren Stromkreis mit den aus der folgenden Tabelle ersichtlichen Da ten angeschlossen werden Tempe ratur klass...

Page 26: ...cker 40 C 80 C 40 C 80 C 30 C 80 C 40 C1 80 C 25 C 80 C T5 40 80 C PVC Kabel 50 95 C Silikon Kabel 30 95 C Kabel LMGSG 501 95 C Anschlussgeh use 25 80 C Stecker 40 C 80 C 40 C 80 C 30 C 80 C 40 C1 80...

Page 27: ...C 80 C 40 C 80 C 30 C 80 C 40 C1 80 C 25 C 80 C T5 40 65 C PVC Kabel 50 65 C Silikon Kabel 30 65 C Kabel LMGSG 501 65 C Anschlussgeh use 25 65 C Stecker 40 C 65 C 40 C 65 C 30 C 65 C 40 C1 65 C 25 C 6...

Page 28: ...h her als die Be triebstemperatur am Einbauort 1 Bitte beachten sie die TR1 TR2 TR3 Kennzeichnung auf dem Typschild Reedkontakt mit Vorwiderstand oder Namur Beschaltung BGU VHTNI und BGU VHTRI Tempe r...

Page 29: ...V Ii 52 mA 45 C Pi 242 mW Ui 16V Ii 76 mA 40 C1 80 C 40 C1 80 C 40 C1 60 C 40 C1 45 C T6 70 C Pi 34 mW Ui 16V Ii 25 mA 66 C Pi 64 mW Ui 16V Ii 25 mA 45 C Pi 169 mW Ui 16V Ii 52 mA 30 C Pi 242 mW Ui 16...

Page 30: ...usf hrung der jeweiligen Ger te ausf hrung des Geh use entspricht und die Verschrau bung f r das verwendete Anschlusskabel geeignet ist Die Verwendung einzelner Litzen ist nicht zul ssig Bei Nicht bea...

Page 31: ...ung BGU AM Mikroschalter Aluminiumgeh use Kabelverschraubung BGU AIH Initiator Hochalarm Aluminiumgeh use Kabelverschraubung BGU AIL Initiator Tiefalarm Aluminiumgeh use Kabelverschraubung BGU VHT Ree...

Page 32: ...fe operation is compliance with all indicated safety and operating instructions Comply with the local accident prevention regulations and general safety provisions for the device The operating instruc...

Page 33: ...ion with KSR bypass level indicators type BNA or comparable products in order to exercise a switch function at a previously defined fill level To this end one or more switches can be added to the leve...

Page 34: ...lt in death or serious injury if not avoided CAUTION refers to a potentially dangerous situation that can lead to minor injuries or property and environmental damages if not avoided INFORMATION highli...

Page 35: ...te vicinity of equipment which can be influenced by magnetic fields distance min 1 m The bypass magnetic switches may not be subjected to any strong mechanical loads impact twisting vibrations The dev...

Page 36: ...po tentially explosive atmospheres The technical data in these operating instructions must be observed During operation make sure that the maximum ambient temperature is not exceeded Claims of any ty...

Page 37: ...in the commercial sector Therefore the operator is subject to the legal obligations for occupational health and safety The safety information in these operating instruction s as well as the safety ac...

Page 38: ...pendently identify possible dangers based on his professional training his knowledge of measurement and control tech nology and experience as well as knowledge of the country specific provi sions and...

Page 39: ...EC 60757 4 Notified body according to EU Directive 2014 34 EU 5 Certificate number and Ex labelling ambient temperature 6 Protection class according to IEC EN 60529 7 Serial number year of manufacture...

Page 40: ...c switches for possible existing transportation damages Immediately report obvious damages CAUTION Damage caused by improper transport Significant property damages can result from improper transport N...

Page 41: ...agnet with a radial magnetic field in the switching range To do this conduct the magnet along the side of the magnetic switch from bot tom to top In doing so the contact must switch over Then move the...

Page 42: ...taneous combustion processes may only originate from the medium itself not from the de vice The ignition hazards from the medium itself must be taken into consideration by the operator and prevented 5...

Page 43: ...the magnetic roller display from the top or the bottom 3 Push the magnetic switch to the height of the desired switching point and fasten by tightening the screws the switching point is specified on...

Page 44: ...tching point is specified Attention The BGU AL and BGU AM magnetic switches are fas tened using 2 tightening straps Note 1 During assembly please make sure that the cable entry points down wards In or...

Page 45: ...evice must be observed Only cable entries and sealing plugs with an EC type ex amination certificate pursuant to EN 60079 0 EN 60079 7 may be used They must be certified for at least the same temperat...

Page 46: ...Connecting the cable Switch off voltage of electrical circuit Remove the cover of the terminal box or the magnetic switch with con nection housing Feed the cable through the cable gland into the term...

Page 47: ...KSR KUEBLER Betriebsanleitung Bypass Magnetschalter BGU I 47 Connection diagram...

Page 48: ...s 5 5 Commissioning Prior to commissioning the magnetic switches should be placed in starting position To do this slowly move the bypass level indicator float in the in side of the pipe from the botto...

Page 49: ...ction Check configuration with the help of the cir cuit diagram Reed contact defective Return to factory incorrect switching be haviour Change terminal config uration Switch position incorrect Re posi...

Page 50: ...ith regard to completing repairs must be observed Please use KSR Kuebler spare parts only for otherwise the conformity with the approval of the type of protection cannot be guaranteed DANGER When work...

Page 51: ...the environment and the equipment Rinse or clean the removed device Appropriate precautionary measures must be taken 1 Before cleaning the device separate the device properly from the pro cess and the...

Page 52: ...om hazards re sulting from residual media 8 1 Dismantling Only dismantle the measuring device in an unpressurised and voltage free state If necessary the container must be released 8 2 Returns To retu...

Page 53: ...HI BGU AILI Ex i Initiator The magnetic switch with initiator may only be connected to a certi fied intrinsically safe circuit with the data which can be discerned from the following table Temper atur...

Page 54: ...ing 25 80 C plug 40 C 80 C 40 C 80 C 30 C 80 C 40 C1 80 C 25 C 80 C T5 40 80 C PVC cable 50 95 C silicone cable 30 95 C cable LMGSG 501 95 C connection housing 25 80 C plug 40 C 80 C 40 C 80 C 30 C 80...

Page 55: ...80 C plug 40 C 80 C 40 C 80 C 30 C 80 C 40 C1 80 C 25 C 80 C T5 40 65 C PVC cable 50 65 C silicone cable 30 65 C cable LMGSG 501 65 C connection housing 25 65 C plug 40 C 65 C 40 C 65 C 30 C 65 C 40...

Page 56: ...than the operat ing tempera ture at the installation site 1 Please note the TR1 TR2 TR3 marking on the type label Reed contact with series resistor or Namur switch BGU VHTNI and BGU VHTRI Tempe ratur...

Page 57: ...d and the am bient temperature and is 5 K higher than the operating tempera ture at the installation site 1 plastic cable gland 20 C 9 3 Cable gland Only cable entries and sealing plugs with an EC typ...

Page 58: ...M Microswitch Aluminium housing Cable gland BGU AIH Initiator high alarm aluminium housing cable gland BGU AIL Initiator low alarm aluminium housing cable gland BGU VHT Reed High temperature Stainless...

Page 59: ...Kabelverschraubung BGU VHT I Initiator Hochalarm Aluminiumgeh use Kabelverschraubung BGU AIHI Initiator Tiefalarm Aluminiumgeh use Kabelverschraubung BGU AILI Description Base types Intrinsic safety...

Page 60: ...3 03 07 Oberfl chentemperatur Temperatur einer Oberfl che in Grad Celsius bei einer Umgebungstempera tur von 25 5 0 C ambient temperature temperature of the air or other media in the immediate vicinit...

Page 61: ...KSR KUEBLER Betriebsanleitung Bypass Magnetschalter BGU I 61 Ex i EU Konformit tserkl rung Ex i EC Declaration of Conformity...

Page 62: ...62 KSR KUEBLER Betriebsanleitung Bypass Magnetschalter BGU I Ex i EG Baumusterpr fbescheinigung EC Type Examination Certificate...

Page 63: ...KSR KUEBLER Betriebsanleitung Bypass Magnetschalter BGU I 63...

Page 64: ...64 KSR KUEBLER Betriebsanleitung Bypass Magnetschalter BGU I...

Page 65: ...KSR KUEBLER Betriebsanleitung Bypass Magnetschalter BGU I 65...

Page 66: ...66 KSR KUEBLER Betriebsanleitung Bypass Magnetschalter BGU I...

Page 67: ...KSR KUEBLER Betriebsanleitung Bypass Magnetschalter BGU I 67...

Page 68: ...ika com Manufacturer contact hergestellt von Sales contact Vertrieb durch KSR Kuebler Niveau Messtechnik GmbH Heinrich Kuebler Platz 1 69439 Zwingenberg am Neckar Germany Tel 49 6263 87 0 Fax 49 6263...

Reviews: