5 Installation at Site
22 of 64
Evamatic-Box N
NOTE
For the installation at site observe EN 12056
Gravity drainage systems inside
buildings
.
NOTE
Comply with all other operating manuals referring to components of this unit.
If transport locks are used, remove them prior to installation.
NOTE
Lifting units should not be installed next to sleeping or living quarters.
NOTE
In countries which require the use of explosion-proof pumps for handling water
containing faeces, this system must not be used for this specific fluid.
5.3 Preparing the collecting tank
5.3.1 Inlet nozzles and vent nozzles
The collecting tanks are fitted with a selection of inlet and vent nozzles of various
sizes and alignments.
DANGER
No vent line fitted
Explosion hazard from gas accumulation!
▷
Always make sure that a vent line is fitted.
Evamatic-Box N 200 l
Evamatic-Box N 500 l
1. Saw off the end of the selected nozzles, making sure that the nozzle passage is
completely open.
To facilitate fitting the connections always leave some of the chamfered
protrusion.