Contents
4 of 76
Etaprime L
5.8.1
Setting the time relay ........................................................................................................................ 30
5.8.2
Earthing .............................................................................................................................................. 30
5.8.3
Connecting the motor ....................................................................................................................... 31
5.9
Checking the direction of rotation................................................................................................................ 31
6
Commissioning/Start-up/Shutdown................................................................................................... 32
6.1
Commissioning/Start-up ................................................................................................................................. 32
6.1.1
Prerequisites for commissioning/start-up ......................................................................................... 32
6.1.2
Filling in the lubricants ...................................................................................................................... 32
6.1.3
Priming and venting the pump......................................................................................................... 33
6.1.4
Final check .......................................................................................................................................... 34
6.1.5
Start-up............................................................................................................................................... 34
6.1.6
Checking the shaft seal...................................................................................................................... 37
6.1.7
Shutdown ........................................................................................................................................... 37
6.2
Operating limits.............................................................................................................................................. 38
6.2.1
Ambient temperature........................................................................................................................ 38
6.2.2
Frequency of starts............................................................................................................................. 39
6.2.3
Fluid handled ..................................................................................................................................... 39
6.3
Shutdown/storage/preservation .................................................................................................................... 40
6.3.1
Measures to be taken for shutdown ................................................................................................ 40
6.4
Returning to service ....................................................................................................................................... 41
7
Servicing/Maintenance........................................................................................................................ 42
7.1
Safety regulations........................................................................................................................................... 42
7.2
Servicing/inspection........................................................................................................................................ 43
7.2.1
Supervision of operation ................................................................................................................... 43
7.2.2
Inspection work.................................................................................................................................. 45
7.2.3
Lubrication and lubricant change of rolling element bearings ...................................................... 46
7.3
Drainage/cleaning .......................................................................................................................................... 49
7.4
Dismantling the pump set.............................................................................................................................. 49
7.4.1
General information/Safety regulations........................................................................................... 49
7.4.2
Preparing the pump set..................................................................................................................... 50
7.4.3
Removing the motor.......................................................................................................................... 50
7.4.4
Removing the back pull-out unit ...................................................................................................... 50
7.4.5
Removing the impeller ...................................................................................................................... 51
7.4.6
Dismantling the mechanical seal ...................................................................................................... 51
7.4.7
Dismantling the bearings .................................................................................................................. 52
7.5
Reassembling the pump set ........................................................................................................................... 52
7.5.1
General information/Safety regulations........................................................................................... 52
7.5.2
Installing the bearings ....................................................................................................................... 53
7.5.3
Installing the mechanical seal ........................................................................................................... 54
7.5.4
Fitting the impeller ............................................................................................................................ 56
7.5.5
Installing the back pull-out unit ....................................................................................................... 57
7.5.6
Mounting the motor ......................................................................................................................... 57
7.6
Tightening torques......................................................................................................................................... 57
7.6.1
Tightening torques for the pump..................................................................................................... 57
7.6.2
Tightening torques for the pump set ............................................................................................... 58
7.7
Spare parts stock............................................................................................................................................. 59
7.7.1
Ordering spare parts.......................................................................................................................... 59
7.7.2
Recommended spare parts stock for 2 years' operation to DIN 24296 .......................................... 59
7.7.3
Interchangeability of Etaprime L and Etaprime B pump components ........................................... 60
8
Trouble-shooting.................................................................................................................................. 61
9
Related Documents.............................................................................................................................. 63
9.1
Sectional drawing and list of components ................................................................................................... 63
9.1.1
Etaprime G and C, threaded connection, with bearing housing (SU 17) ....................................... 63
9.1.2
Etaprime G and C, flanged connection, with bearing bracket/grease lubrication (SU 25 and
SU 35).................................................................................................................................................. 65
9.1.3
Etaprime G and C, flanged connection, with bearing bracket/oil lubrication (SU 25 and SU 35) .....
69
Summary of Contents for Etaprime L
Page 1: ...Self priming Pump Etaprime L Installation Operating Manual...
Page 74: ......
Page 75: ......